Browse
Search
Agenda 06-16-2026; 6-f - FY 2027 Transit Tax Annual Work Program and Financial Model Update
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2026
>
Agenda - 06-16-2026 Business Meeting
>
Agenda 06-16-2026; 6-f - FY 2027 Transit Tax Annual Work Program and Financial Model Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 3:54:02 PM
Creation date
6/11/2026 3:35:11 PM
Metadata
Fields
Template:
BOCC
Date
6/16/2026
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-f
Document Relationships
Agenda for June 16, 2026 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2026\Agenda - 06-16-2026 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20 <br /> UNFUNDED PRIORITIES <br /> Type <br /> Town of Carrboro <br /> Short section of multi-use path and crossing; identified as a priority in Carrboro's bicycle <br /> U Homestead Road multi-use path and crossing plan update(2020) $938,437 <br /> Complete the missing sections of sidewalk on Old Fayetteville Road(behind Carrboro <br /> Old Fayetteville Road sidewalk connections Plaza); identified as an unfunded priority in 2017 transit plan $750,000 <br /> Pedestrian safety improvements on Starlite Drive,sidewalk on north side or roadway; <br /> Starlite Drive sidewalk identified as a priority by residents of Starlite Drive $270,106 <br /> 10-foot-wide multi-use path, approximately 0.7 mi long,extending through Baldwin Park <br /> Baldwin Park connector and connecting Carrboro and Chapel Hill. $299,000 <br /> Bike and pedestrian connection from East Main Street to Roberson(new public facilities <br /> 203 Connector including library) $172,500 <br /> 2 20%local match; provides off-road access to University Lake and eventually Carrboro <br /> High <br /> Morgan Creek Greenway Phase 2 School for residents living in apartments along NC 54 $366,800 <br /> BPW Road sidewalk connections Complete missing sections of sidewalk $170,000 <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.