Orange County NC Website
J10327.000-0032-000 <br /> • For Delegated Design OR Design Build work where the Contract Sum is greater than$50,000,000,then the insurance limit shall <br /> instead be defined in Article 13 of this Agreement. <br /> 2.6 Pollution Liability: If the Trade Contractor's scope of work(including the scope of any of its subcontractors or subconsultants) <br /> includes providing pollution services that include,but are not limited to,work involving water or wastewater,(including without limitation fire <br /> suppression,pool installation,HVAC,plumbing,underground utilizes and sewers)as defined in applicable law,regulation,ordinance or code,or <br /> performing:testing,investigation and characterization of contamination of land,groundwater or structures,demolition of structures,abatement, <br /> replacement,repair,enclosure,encapsulation of hazardous or regulated materials(Hazardous or regulated materials shall include,but are not <br /> limited to,asbestos,petroleum products,lead,mold,mercury or polychlorinated biphenyls("PCBs")),remediation of contaminated soil or <br /> groundwater including transportation and disposal of contaminated media,installation or removal of underground storage tanks,or any storage, <br /> transportation or disposal of materials that are hazardous or regulated under environmental laws by the Trade Contractor or by subcontractors <br /> on behalf of the Trade Contractor,the Trade Contractor shall provide Contractor's Pollution Liability Insurance <br /> • Limits: <br /> • $5,000,000 Each Occurrence <br /> • $5,000,000 Aggregate <br /> • The policy shall include coverage for bodily injury and property damage liability,remediation,defense costs,and clean-up costs <br /> arising from pollution events or conditions on,at,under or migrating from the Work site,and from transportation and disposal of <br /> pollutants and/or contaminated by pollution and shall provide non-owned off-site disposal coverage if hazardous or regulated <br /> materials will be transported to a disposal site. <br /> • If Trade Contractor's scope of work includes mold/fiangus remediation or the Project involves any residential,health care,custodial <br /> care or educational occupancy,then the contractor's pollution liability insurance shall include mold/fungus liability coverage for the <br /> full amount of the limits required herein. <br /> • If Trade Contractor is subcontracting out its entire scope of pollution services,Construction Manager may accept proof of the <br /> pollution liability insurance required in this Article from each person or entity who is performing the pollution services on behalf of F <br /> Trade Contractor. <br /> • The retroactive date on all pollution liability policies provided by Trade Contractor or any of its subcontractors shall precede the <br /> start of any work. <br /> L <br /> 2.7 Contractor's Equipment/Property Coverage <br /> II <br /> Trade Contractor shall procure and maintain all-risk property insurance necessary for protection against loss of owned,borrowed,or rented <br /> equipment or tools(including mechanical heavy equipment)including any tools owned by employees,and any tools,equipment,staging towers, <br /> and forms and other property,the capital value of which is not intended to be incorporated into the Work. The Trade Contractor shall be <br /> responsible to provide insurance for any purchased material while in off-site storage and/or in transit. <br /> If Trade Contractor's Work includes move management services such that it is responsible for: moving of personal property from one location to <br /> another(or within a single location),storage of personal property at one or more locations and/or installation of personal property then it shall <br /> provide an installation floater covering such exposures for the full replacement cost of such property. Failure of the Trade Contractor to secure <br /> such insurance or to maintain adequate levels of insurance shall not obligate Construction Manager or the Owner or any other Additional I I I <br /> Insured/Indemnitee for any losses.Policy shall include a Waiver of Subrogation in favor of all Additional Insureds. <br /> P <br /> 2.8 Crane Utilization Requirements/Riggers Liability: All Trade Contractors operating,hiring or contracting others to use,operate <br /> or hire a crane will be required to supply Construction Manager with an updated crane certification and adhere to all current OSHA Standards, <br /> including OSHA Standard#1926.1427,and any subsequent revisions. The crane certification shall be kept on the job site at all times. <br /> • Trade Contractor will maintain or cause to be maintained property damage insurance sufficient for the value of the crane. <br /> -39- <br />