Browse
Search
Agenda 06-16-2026; 6-c - Approval of the Guaranteed Maximum Price for the Construction of the Crisis Diversion Facility, and Approval of Budget Amendment #12-A
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2026
>
Agenda - 06-16-2026 Business Meeting
>
Agenda 06-16-2026; 6-c - Approval of the Guaranteed Maximum Price for the Construction of the Crisis Diversion Facility, and Approval of Budget Amendment #12-A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 3:52:17 PM
Creation date
6/11/2026 3:32:45 PM
Metadata
Fields
Template:
BOCC
Date
6/16/2026
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-c
Document Relationships
Agenda for June 16, 2026 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2026\Agenda - 06-16-2026 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J10327.000-0032-000 r <br /> Trade Contractor to proceed with a change in the Work prior to agreement on any <br /> adjustment of the Contract Sum and/or Contract Time; <br /> "Subcontractor Change Order" Shall mean the written instrument signed by the Construction Manager and the Trade <br /> Contractor stating their agreement on a change in the Work and any adjustment of the <br /> Contract Sum and/or Contract Time; <br /> "Substantial Completion" Unless defined otherwise within the Prime Agreement,Substantial Completion shall <br /> mean,with respect to the Work or designated portions thereof,the Work is <br /> sufficiently complete in accordance with the Contract Documents so that the Owner <br /> can use the Work for its intended purposes; <br /> "Substantial Completion Date" Shall be identified on the Construction Schedule attached hereto; <br /> "Suitable","reasonable","proper","correct"and Shall mean as suitable,reasonable,proper,correct,or necessary for the purpose <br /> "necessary' intended as required by the Contract Documents,subject to the judgment of the <br /> Architect,Owner or the Construction Manager; <br /> "Testing Laboratory" Shall mean an independent entity engaged to perform specific inspections or tests of <br /> the Work,either at the project site or elsewhere,and to report and interpret the <br /> results of those inspections or tests; <br /> "Trade Contractor's Lower Tier Contractor(s)" Shall mean any subcontractor,materialman or supplier entering into a written <br /> subcontract with the Trade Contractor;and <br /> "Work" Shall mean the construction and completion of the Project and performance of all <br /> other obligations of the Trade Contractor together with all items reasonably inferable <br /> from the Contract Documents whether or not such items are fully detailed or specified <br /> in the Contract Documents. <br /> IIl <br /> -35- <br />
The URL can be used to link to this page
Your browser does not support the video tag.