21 <br /> ORANGE COUNTY CRISIS DIVERSION CENTER <br /> HILLSBOROUGH,NC <br /> Pre-Bid RFI Log <br /> Comment# Discipline Reference Comments/Concerns/Questions Answered By: Response <br /> 065 Electrical Does the fire alarm system need to tie into the existing Orange County Desigo CC sy Justice Harris Yes,the fire alarm system will need to tie into the existing Desigo System. <br /> 066 Civil L3.0 Please provide details&specifications for river rock/metal edging,etc. Caleb Robinson Use attached detail. <br /> Please provide details&specifications for site furnishings <br /> 067 Civil L3.0 Caleb Robinson Include 3 waste receptacles and 3 U-bike racks.Specification sheets attached. <br /> If there are any other site furnishing,please provide speffications&Details <br /> Substitution Request: <br /> 068 Electrical Proposed Generator Substitution:Curtis Power Solutions MTU Michael Ranieri MTU is acceptable. <br /> See attached <br /> Please refer to dwg#E200 detail#2—shows"ECB-EV"in Electrical Room#1702 by the side of <br /> 069 Electrical E200 Detail 2 Panel EV.But we do not see it on the power riser-is it required?Please Confirm, Justice Harris Enclosed circuit breaker not required.Drawing has been updated. <br /> Please refer to dwg#E050—Keynote#3 Calls for 3 Cell Maxell Innerduct-but does not mention <br /> 070 Electrical E050 Keynote 3 the size of innerduct—is it 1",1.25"or 1.5".Please confirm the size of inner dud.Please also Justice Harris Innerduct should be 1.5"and fabric mesh. <br /> confirm it is Fabric or Fabric Mesh <br /> Please refer to site plan dwg#E050-clarify 9 the Secondary Dud bank is concrete encased or <br /> not? Secondary ductbank is by Piedmont EMC.Generator dud bank not required to <br /> 071 Electrical E050 Justice Harris be encased in concrete.Encase generator duct bank in pea gravel. <br /> Is the Generator Ductbank Concrete Encased? <br /> 072 Electrical Can MC Cable be used between light fixtures above ceiling and Home Runs in EMT for Justice Hams The intent is for a junction box and 6'whip for each fixture.Do not"daisy chain" <br /> lighting branch? the fixtures with MC. <br /> Are any Hospital Grade Receptacles anywhere on this project.If so,please specify areas in All receptacles throughout facility to be hospital grade.Specifications have been <br /> 073 Electrical which we are to use Hospital Grade Receptacles.As specifications are not calling for Hospital Justice Hams updated. <br /> grade receptacles.Please clarify? <br /> 074 Architectural H1/A701 Do patient rooms receive a SSM1 Windowsill?Reference H1/A701 Danielle Scesney Yes,provide ssm window sills at patient room windows. <br /> SC-1 on the finish schedule is shown as Metalworks Linear Perforated,in the specifications it Metalworks Linear Perforated as indicated on Finish Schedule is correct product <br /> 075 Architectural is listed as Linear wood planks.Could you verify which one is to be used?Additionally,what is Kelley Mock _NRC is 0.70 <br /> the NRC rating for this ceiling? <br /> ACT-3 is the Amstrong woodworks ceiling tile,the specfication/fnish schedule shows to install <br /> 076 Architectural with white grid.Is this the finish intended for this area?Or is there to be a custom color grid to Kelley Mock White Grid <br /> match the wood? <br /> 077 Architectural <br /> Has a wood species has been selected forthe flush wood doors?The Flush Wood Door Kelley Mock Plain Sliced White Maple(Color to be selected from manufacturers standard <br /> specification advises seeing the finish schedule which states to be determined by the architect. line) <br /> 078 Architectural Glazing film at vestibule entry.I still see it on the finish schedule Danielle Scesney Correct,there is not glazing film on the project. <br /> Please confirm if any undergound conduits need to be concrete encased(fiber telecom fiber <br /> conduits,generator,etc.)Detail 4/E800 states fiber is concrete encased. <br /> 079 Electrical 4/E800 Justice Harris Concrete encasement is not required. <br /> RFI response 71 states generator duct bank does not need to be concrete encased,but detail <br /> 1/E800 says this detail does not apply to generators. <br /> Please confirm if ground rod&test well locations.Ground rods and test stations are shown at <br /> every connection.Typically we use the four corners of the building for test wells. <br /> 080 Electrical E060,2&3/E801 Please confirm if traffic rated test wells are necessary,these will be in green areas. Justice Harris Test wells at 4 locations is fine.#2/0 is fine.Tier 8 boxes are okay. <br /> Please confirm wire sizing for grounding loop.The drawing shows#2/0 but the detail calls for <br /> 250kcmil which is unusual. <br /> 081 A601 Will exposed ceilings be painted?RCP/Finish plan does not indicate.Spec section 099123 Brooke Ross No,exposed ceilings will not be painted. <br /> 2.3E Dry Fall indicates exposed ceiling to be painted. <br /> Interior paint specifications 099123 call for wet areas to receive 2 component water based <br /> catalyzed epoxy while the high-performance specifications 099600 call for single component Intent is to use 2-component water based catalyzed epoxy found in the interior <br /> 082 precatalyzed epoxy which is significantly less costly and less durable.Is it the intent to use the Brooke Ross specifications. <br /> 2-component water based catalyzed epoxy found in the interior specifications or the single <br /> component precatalyzed epoxy? <br /> 083 Structural Please confirm that no HSS diaphragm collectors are required at the roof Brian Cooney Provide HSS3x2 1/2x1/4 diaphragm collectors between K-Series joist seats on <br /> Girder Lines 2,3,4,5,6,7,7.1,8,9,11,and 12. <br /> 4 of <br />