20 <br /> ORANGE COUNTY CRISIS DIVERSION CENTER <br /> HILLSBOROUGH,NC <br /> Pre-Bid RFI Log <br /> Comment# Discipline Reference Comments/Concerns/Questions Answered By: Response <br /> Please refer to dwg#E800-detail#1 gives Bollard Base Detail for a 42"High Bollard.In our Bollard detail is incorrect.Install'PW'fixture per manufacturers <br /> 040 Electrical E800,#1 case the Bollard is 7"Diameter and 11"High.Is a bollard Base 4'deep necessary? Justice Harris recommendations. <br /> Please refer to Fixture Schedule on dwg#E900 what the Pole Length for Pole Lights PA,PB <br /> 041 Electrical E900 and PC is? Justice Harris Pole base detail has been added to E800.Pole length should be 20'. <br /> Also,provide details of Pole Base for Pole Lights PA,PB and PC <br /> Please clarify dwg#E802 detail#2-there is a reference to existing building-the same <br /> 042 Electrical E802 Detail#2 reference is also there on other drawings-are we in anyway connecting this new building/work Justice Harris Detail has been updated. <br /> with some other building/buildings. <br /> The contractor is to provide the rigid conduit roof penetration for the donor <br /> 043 Electrical Is the electrical contractor to provide rough in and power for the potential future BDA system Michael Ranieri antenna cabling to the head end.Conduit sleeves over hard ceilings for antenna <br /> cabling.Monitoring modules and points for connection to the fire alarm system. <br /> 044 Electrical/Civil No power or FACP conduit for Back Flow Preventer on the site plan-is it required?If so, Justice Harris Fire alarm connection to backflow preventer on the site is not required. <br /> please provide location,size of conduit and circuit#etc <br /> 045 Architectural Please provide Roof top mechanical screen wall specifications Danielle Scesney Mechanical screen wall specification to be provided in upcoming addendum. <br /> 046 Architectural 101/A831 Reference 101/A831-Please confirm"Unistrut pipe support assembly" Danielle Scesney This is not required. <br /> 047 Architectural 101/A832 1011AB31(and sim)-Cabinets are drawn with shelf standards.Specs call for in-line bore Danielle Scesney Provide shelf pin as indicated in the specifications. <br /> pegs <br /> 048 Architectural 151/A831 151/A831-Please confirm steel is required at front of cabinet unit.This is self supporting and Danielle Scesney Steel is not required. <br /> not required if drawn <br /> 049 Architectural 1541A832 154/A831-Please confirm 9 steel is required.No gang restrooms and most aprons do not Danielle Scesney Steel is not required. <br /> anchor into adjacent wall <br /> Trim is not required R the roll up door hood is fully enclosed in the selected <br /> 050 Architectural 9/A831 9/A831-please clarify trim is required at head/jamb of roll up door Danielle Scesney manufacturer details and there is not a significant gap between the face of the <br /> door in a closed position and the adjacent attachment wall. <br /> 051 Architectural 10-11/A831 10-1l/A831-Is melamine required on the underside of countertops?This will put Danielle Scesney Melamine is not required on the underside of countertops. <br /> considerable costs on a concealed surface of a cabinet <br /> 052 Structural 0330002'G4 J Please provide areas where this admixture is required. Brian Cooney Delete Rem;Not Required on project <br /> Waterproofing dmixture <br /> Is a Moisture Emission Reducing Curing and Sealing Compound,Penetrating with Warranty Yes,use of the Moisture Emission Reducing Curing and Sealing Compound is <br /> 053 Structural 033000 1.06 B for 20 yrs Brian Cooney required,regardless.Contractor to coordinate use of ancillary items with sealer <br /> Is this required if a moisture retaining cover per 2.07D is used? manufacturer's guidelines. <br /> 054 Structural 033000 2.01 b.2 Are Earth formed footings not allowed for this project? Brian Cooney Footings shall be formed. <br /> 055 Structural 33000 3.11 Which floor treatments are used and where as referenced in this spec section. Brian Cooney Delete Paragraph;Not Required on project. <br /> At least 40%of the total cost of manufactured products must be U.S.-made. <br /> 056 Electrical Is there a domestic content requirement for the solar PV scope?If so,please confirm the Michael Ranieri This includes components such as modules,inverters,racking and other system <br /> required percentage. equipment. 100%of steel andiron used in the project must be produced in the <br /> United States. <br /> At least 40%of the total cost of manufactured products must be U.S.-made. <br /> 057 Electrical Do the solar PV components—including modules,racking,and inverters—need to comply with Michael Ranieri This includes components such as modules,inverters,racking and other system <br /> FEOC requirements? equipment.100%of steel and iron used in the project must be produced in the <br /> United States. <br /> Please confirm whether it is acceptable to utilize a single inverter of approximately 100 kW <br /> 058 Electrical E701 capacity in lieu of the three smaller inverters,provided that all other system performance and Michael Ranieri At least(2)inverters must be used. <br /> design requirements are met. <br /> We understand that the solar PV system is currently listed as an alternate for this project. <br /> 059 Electrical E701 Please clarify whether any portion of the solar scope—specifically,conduit installation( Michael Ranieri Entire solar PV system scope is to be included as pan of the alternate. <br /> associated with the PV system)—is required to be included in the base bid,or if the entire <br /> solar PV system scope,including all conduit,wiring,and associated infrastructure,is to be <br /> included only as part of the aftemate. <br /> 060 Electrical E701 Please confirm the preferred location for the AC disconnect and the AC combiner panel PV? Justice Harris Locate AC disconnect and AC combiner panel to be located on exterior wall <br /> outside Warthin Kitchen. <br /> Please confirm the exact point of interconnection for the solar PV system. <br /> 061 Electrical E701 Additionally,please clarify the required method of connection,specifically whether the Michael Ranieri Construction Manager to provide response. <br /> interconnection is to be made via a line-side tap,load-side connection(breaker),or load-side <br /> tap.Who will be responsible for this connection,the solar contractor or the electrical <br /> contractor? <br /> Module Substitution Request <br /> 062 Electrical E701 8 Photovoltaic Spec Michael Ranieri Hyundai Solar HiN is acceptable.ImnRidge Racking is acceptable. <br /> 26 31 00-4 2.01 Proposed Module:Module#1:Hyundai Solar HiN-T595NI-595W <br /> Proposed Racking system:IronRidg Racking Systems <br /> Yes,refer to specification section 0140 00 Quality Requirements for testing <br /> 063 Architectural 084313,3.04,C Is water spray testing per this spec section required to be by third party? Danielle Scesney agency requirements.Water spray testing could be incorporated into the special <br /> inspections agency scope if the selected agency is qualified to perform the test. <br /> 064 Architectural Missing 08 80 00 Glazing Specification Danielle Scesney Glazing specification to be provided in an upcoming addendum. <br /> 3of4 <br />