Orange County NC Website
17 <br /> Clarifications <br /> > Asphalt prices are based on NC DOT Monthly Terminal Prices for asphalt binder at $685.00/liquid TN <br /> of asphalt cement is included. For each 1.00 variance in the index cost of a ton of liquid asphalt, price <br /> will increase $0.05 per ton of hot asphalt used on the project <br /> FOUNDATION &SUPERSTRUCTURE <br /> > The GMP does not include any Deep Foundations (piles, caissons, piers, etc.). <br /> LANDSCAPING <br /> > The GMP does not include any irrigation. Maintenance of installed landscaping is included for the <br /> duration of Gilbane's work until substantial completion. <br /> > The GMP includes an Owner Allowance for site furnishings. <br /> BUILDING INTERIORS& EQUIPMENT <br /> > Code Required and Monument signage is included. An Owner Allowance is included for room signage. <br /> > The GMP includes appliances per the Responsibility Matrix on A700. An Owner Allowance is included <br /> for additional appliances. <br /> FIRE PROTECTION <br /> > The GMP does not include a Fire Pump and assumes the existing GPM feeding the site Fire Water Line <br /> is sufficient. <br /> > The GMP does not include Fire Sprinkler coverage at Exterior Canopies. <br /> PLUMBING <br /> > The GMP excludes any Natural Gas. <br /> HEATING,VENTILATING &AIR CONDITIONING <br /> > The GMP includes an Owner Allowance to provide extended manufacturer's warranty coverage to start <br /> mechanical equipment prior to substantial completion. <br /> ELECTRICAL, COMMUNICATIONS, SAFETY&SECURITY <br /> > The GMP does not include cabling,terminations,jacks, devices, for Access Control, Video Surveillance, <br /> Security, Telecom, Nurse Call, and Audiovisual as these are assumed by the Owner. <br /> > The GMP does not include a DAS Cell Boost System. <br /> > The GMP includes an Owner Allowance for a BDA System (Bidirectional Amplification System). <br /> > The GMP includes an Owner Allowance for(2) EV Charging Stations. <br /> > The GMP includes (4) non-traffic rated test wells for the grounding loop. <br /> > The GMP includes plenum rated cable for Fire Alarm scope of work per Pre-Bid RFI Log. Conduit and <br /> raceways are not included above ceilings. <br /> Orange County Crisis Diversion <br /> 100%Design Development r <br />