Orange County NC Website
<br /> <br />Page 3 of 15 <br /> <br />Upon receipt of equipment on the job site, Brady will inspect the unit for possible damage during transit. This will <br />include an inspection of unit exterior, all doors, access panels and openings. If damage has occurred it will be <br />immediately reported to the delivering carrier and the damage noted on the receiving copy of the bill of lading. <br /> <br />Air Balance <br />Brady excludes system air balancing for this project. The AHU air flow rate will be set per the manufacturer’s <br />specifications. <br /> <br />Start-Up <br />A Brady factory-authorized technician will perform start-up and inspection of the new split system according to the <br />manufacturers' written instructions. <br /> <br />Clarifications <br />All work is based on straight time hours: Monday through Thursday from 7:00 am to 5:30 pm. <br /> <br />Brady requires that the equipment for this project go through a submittal and review process to verify equipment <br />design and performance before the final order of equipment will be released. This is completed to ensure that the <br />end result meets the owner’s expectations. Brady will request that you assign a company representative to review <br />and sign off on the equipment prior to order placement. <br /> <br />When crane work is to be performed over an occupied area a crane lift plan will be provided by the crane <br />company. The plan will be reviewed by Brady’s onsite superintendent and your site appointed personnel before <br />any lifting begins. We will require the area surrounding the lift be cleared and barricaded during the work. Once all <br />lifting has been completed, all work may resume. <br /> <br />Any code deficiencies related to the existing conditions not specifically identified in our proposal is not included in <br />our scope of work. <br /> <br />Unforeseen conditions related to the owners equipment or building that adversely impact the cost of the project <br />may result in additional changes. <br /> <br />This proposal excludes all work on energized electrical systems, including but not limited to electrical panels, <br />disconnects, motor control centers (MCCs), switchgear, or similar components. All connections, repairs, and <br />modifications will be performed only after the equipment has been properly de-energized, locked out, and verified <br />safe for work. <br /> <br />Docusign Envelope ID: 25E6F8BF-2DC9-828C-811A-1377E8921918