Orange County NC Website
<br /> <br />Page 2 of 15 <br /> <br />Thank you for choosing Brady as your HVAC support partner. We are committed to working with you to ensure your <br />building serves the needs of your organization. We appreciate the opportunity to provide you with a proposal for the <br />equipment and services as detailed in the following pages. This proposal is based on our site visit and information <br />provided by the owner for the installation of the new equipment. Any revision or request of change to scope of work by the <br />owner at a later date would be subject to price review at that time. <br />Split System Scope of Work <br /> <br />Equipment Demolition, Installation and Specification <br />Brady will include all labor, accessories, tools, equipment and materials required to execute the installation of a <br />new Mitsubishi 1 1/2 ton ductless split system. <br /> <br />Pipe, Valves, Fittings <br />Brady will furnish and install all pipe, valves, fittings and specialty items as needed for refrigeration piping. <br /> <br />All refrigeration piping will be type “L” hard drawn copper tubing and wrought copper fittings. All piping will be <br />cleaned, dehydrated, sealed and marked ACR. <br /> <br />Copper to copper joints will be brazed with a copper-phosphorous brazing alloy containing a minimum of 15% <br />silver. <br /> <br />After completing piping work, Brady will perform a piping pressure test. Brady will use a vacuum pump to evacuate <br />and dehydrated the refrigeration system until the system has been evacuated to 500 microns and held for four <br />hours. <br /> <br />Brady will charge the refrigerant piping system to meet the manufacturer’s specifications. <br /> <br />Controls <br />Brady to furnish and install a programmable thermostat and low voltage wiring. <br /> <br />Electrical <br />Owner to provide electrical service to the condensing unit disconnect. <br /> <br />Brady will provide and install electrical wiring from owner provided disconnect at condensing unit to the equipment. <br /> <br />Brady will provide and install electrical wiring from the condensing unit to the AHU. <br /> <br />Electrical connection to equipment will be made with short lengths of flexible "Liquid - Tite" conduit. <br /> <br />All equipment has been selected for 208 volts, 60 hertz and 1 phase electrical service. <br /> <br />Brady will provide nameplates for identification of all equipment, motor starters and disconnect switches. <br /> <br /> <br />Pipe Insulation <br />Brady will insulate the refrigerant suction piping with ¾” armaflex insulation. <br /> <br /> <br />Crane and Rigging <br />Brady will furnish all crane, rigging, and trucking as needed for this project. <br /> <br />Docusign Envelope ID: 25E6F8BF-2DC9-828C-811A-1377E8921918