Browse
Search
2026-221-E-Planning Dept-Schnabel Engineering South-Contract Amendment #4 No cost time extension for delivery of Milestone Task 5 Lake Orange Intake Tower Rehabilitation-Replacement Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2026
>
2026-221-E-Planning Dept-Schnabel Engineering South-Contract Amendment #4 No cost time extension for delivery of Milestone Task 5 Lake Orange Intake Tower Rehabilitation-Replacement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 1:35:55 PM
Creation date
6/11/2026 1:35:53 PM
Metadata
Fields
Template:
Contract
Date
6/1/2026
Contract Starting Date
6/1/2026
Contract Ending Date
6/8/2026
Contract Document Type
Contract
Amount
$0.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised 01/24 <br /> <br />NORTH CAROLINA <br />CONTRACT AMENDMENT #4 <br />ORANGE COUNTY <br /> <br /> <br />THIS CONTRACT AMENDMENT (“Amendment”) is made and entered into this 29th day of May 2026 by and <br />between ORANGE COUNTY (hereinafter referred to as “County”) and Schnabel Engineering South, P.C (hereinafter <br />referred to as “Provider”). <br /> <br />WITNESSETH: <br /> <br />THAT WHEREAS, the County and Provider entered into a contract dated November 1, 2024, with an internal designation <br />of 2024-674 (hereinafter the “Original Agreement”), for the provision of services for Professional Engineering Services <br />for the Lake Orange Intake Tower Rehabilitation-Replacement Project; and <br /> <br />WHEREAS, the County and Provider entered into a contract amendment dated February 28, 2025, with an internal <br />designation of 2025-094 (hereinafter “Contract Amendment 1”), for the provision of a no-cost time extension for <br />Professional Engineering Services for the Lake Orange Intake Tower Rehabilitation-Replacement Project; and <br /> <br />WHEREAS, the County and Provider entered into a contract amendment dated January 16, 2026, with an internal <br />designation of 2026-027 (hereinafter “Contract Amendment 2”), for the provision of a no-cost time extension for <br />Professional Engineering Services for the Lake Orange Intake Tower Rehabilitation-Replacement Project; and <br /> <br />WHEREAS, the County and Provider entered into a contract amendment dated March 11, 2026, with an internal <br />designation of 2026-088 (hereinafter “Contract Amendment 3”), for the provision of a no-cost time extension for <br />Professional Engineering Services for the Lake Orange Intake Tower Rehabilitation-Replacement Project; and <br /> <br />WHEREAS, the County and Provider desire to amend the Original Agreement while keeping in effect all terms and <br />conditions of the Original Agreement not inconsistent with the terms and conditions set forth below. <br /> <br />NOW THEREFORE, for and in consideration of the mutual covenants and agreements made herein, the parties agree to <br />amend the Original Agreement as follows: <br /> <br />1. Section 3(a)(ii) is replaced in its entirety with the following: <br /> <br />The Basic Services will be performed by the Provider in accordance with the following <br />schedule: (Insert milestones task list, dates and fees. If milestones are not established mark <br />N/A under Milestone Task 1.) <br /> Milestone Task <br /> <br />1. Kickoff and Field Investigations <br />Milestone Date Milestone Fee <br /> <br /> March 31, 2025 $48,000 <br />2. Alternatives Analysis April 30, 2025 $48,000 <br />3. 60% Design June 30, 2025 $48,000 <br />4. Geotechnical Support and Report <br />5. 95% Design <br />May 8, 2026 <br />June 12, 2026 <br />$36,100 <br />$48,000 <br />6. 100% Design and Permitting <br />7. Bidding and Award <br />July 17, 2026 <br />January 13, 2027 <br />$48,000 <br />$48,000 <br />Docusign Envelope ID: 22398BE6-5C05-86DE-8231-A0ACDE133ECF
The URL can be used to link to this page
Your browser does not support the video tag.