Orange County NC Website
Questionnaire <br /> day one, actively contributing to design decisions, pricing as they are often the closest to what is driving <br /> identifying cost-saving opportunities, and solving the final cost of work. While their options may not <br /> problems before they impact budget or schedule. We'll always be viable, it can uncovers items that may be <br /> guide the County through the entire process, from driving costs the team members may not be aware of. <br /> establishing realistic budgets during schematic design When options concern MP&E equipment changes, <br /> through developing the Guaranteed Maximum Price we know there may be more at stake then up front <br /> and managing competitive bidding that maximizes cost savings. In those cases we partner with the <br /> MWBE participation. Owner's engineering and design teams to ensure <br /> those options are properly vetted so the Owner can <br /> Our experience demonstrates this collaborative be presented with the full picture of short-term costs, <br /> approach works. We delivered the Forsyth County potential performance or efficiency differences, or <br /> Courthouse and have built fire stations police long term maintenance impacts. Together the team <br /> headquarters, and emergency operations centers. can make wiser decision to the Owner's long term <br /> We know these mission-critical facilities and how interests. <br /> to partner with design teams and owners to get the We track Value Engineering Options in the Cost <br /> details right. With 40 employees in our Charleston Management Log (CML) showing each proposed <br /> office generating $150 million in annual revenue,we change its value and tracks what has been accepted, <br /> have the capacity and local presence to be responsive rejected or is still open. <br /> partners throughout this multi-year project. Our 0.48 <br /> EMR safety rating and established relationships with <br /> qualified local subcontractors mean we deliver on 14. Describe how responsibilities as a CM at Risk <br /> our commitments to both quality and community dimer from responsibilities as a General Contractor. <br /> participation. As a CM at Risk, our role is significantly <br /> Orange County will have a partner committed broader than a General Contractor: we manage the <br /> to transparency,proactive communication, and construction process in the best interest of the Owner. <br /> shared success throughout preconstruction, bidding, A General Contractor is responsible for delivering <br /> construction, closeout, and warranty management. the project per the design documents for a fixed price <br /> We'll use our CMAR experience to guide you through obtained through bidding. Challenges, changes, or <br /> key decisions and ensure this critical facility is coordination issues can and often do impact overall <br /> delivered on time, within budget, and ready to serve project cost and delivery. <br /> your community for generations to come. As a Construction Manager, we manage the entire <br /> construction process in the Owner's interest. This <br /> 13. Describe your value engineering process. includes early involvement to understand Orange <br /> County's goals, budget constraints, schedule <br /> As discussed in our Cost Management Section requirements, and other needs. We then develop <br /> above (7), we utilize a Target Value Design approach a comprehensive project schedule and help all <br /> throughout preconstruction to minimize the need for stakeholders work together to ensure the County can <br /> Value Engineering at the end of the process. However occupy the facility when needed. <br /> knowing a certain amount is typically inevitable, <br /> Our value engineering process follows the following Additionally, as described in our Cost Management <br /> framework: approach, we ensure the project budget is sufficient <br /> to complete the intended scope and manage costs <br /> Identify alternate materials, systems, or details we that cannot be fully defined at the time of GMP <br /> believe may results in a lower final cost to the Owner establishment. All project costs are tracked in a <br /> during the design development process and include transparent and auditable manner so Orange County <br /> these as alternates during Subcontractor pricing. This knows exactly what is being spent with trade <br /> is a more proactive process where the Project Team contractors to perform the work. <br /> knows what to expect ahead of time and pricing for <br /> those options is obtained competitively. Finally,when issues arise,we act in the County's <br /> interest to manage solutions and costs with trade <br /> Solicit Subcontractor's and Vendors to propose contractors using the same transparent reporting. <br /> cost saving options that seem obvious to them during <br /> RFQ 367-005466 /The Renovation& Construction of Sheriff's Office Facilities <br />