Browse
Search
Agenda 06-02-2026; 8-g - Approval of a Contract with Samet Corporation for Construction Manager-At-Risk Services for the Renovation of the John M. Link, Jr. Government Services Center and Construction of the Sheriff’s Evide
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2026
>
Agenda - 06-02-2026 Business Meeting
>
Agenda 06-02-2026; 8-g - Approval of a Contract with Samet Corporation for Construction Manager-At-Risk Services for the Renovation of the John M. Link, Jr. Government Services Center and Construction of the Sheriff’s Evide
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 5:15:22 PM
Creation date
5/28/2026 5:17:54 PM
Metadata
Fields
Template:
BOCC
Date
6/2/2026
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-g
Document Relationships
Agenda for June 2, 2026 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2026\Agenda - 06-02-2026 Business Meeting
PRO-2026-027-Juneteenth Freedom Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2026
PRO-2026-028-Proclamation Recognizing June 2026 as Pride Month
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2026
PRO-2026-029- National Gun Violence Awareness Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2026
PRO-2026-030-Trails Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2026
RES-2026-037-Refund-Release resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2026
RES-2026-038-Refund-Release resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Questionnaire <br /> 82 <br /> updating of complex schedules. The development subcontractor submittals, clarification requests, <br /> of the project schedule begins at the earliest stages issuance of bulletin drawings, development of cost <br /> of preconstruction and goes through a process of proposals, identification and justification of change <br /> development typically with 3 updates prior to the orders,payment requests, commissioning,final <br /> issuance of the GMP. This results in a fully detailed inspections and assembly of the project close-out <br /> schedule for bidding to trade contractors and one final documents? <br /> update with the successful bidders to be incorporated Subcontractor Submittals: Managing the <br /> in the GMP. This ensures all trades are fully bought submittal process is critical to overall success in <br /> into the Contract Schedule before it is finalized. delivering the project on time and to the expected <br /> Consideration in the project schedule is given for: standards. This is as true in terms of timeliness and <br /> • Durations for schematic design/design accuracy from our trade partners as it is with review <br /> development/construction documents at the design team. Samet develops a schedule for <br /> o Estimating &Permitting submission of submittals from our trader partners <br /> o Proposed early release packages (if any) that is both realistic to the stakeholders' workloads <br /> o Framework of the construction activities grouped and fairly prioritizes the needs of the project. We <br /> for sequencing, schedule, and durations. work closely with the design team to make sure those <br /> o Timelines for commissioning and training of priorities are understood,providing extra time when <br /> systems. available and requesting faster time when needed. <br /> o Move out/move in timelines Success comes from us all working together to drive <br /> Throughout the construction period, the Master the work in the field happening on time and to meet <br /> Construction Schedule is updated as the progress the design. Further, Samet reviews all submittals <br /> dictates appropriate. The superintendent will utilize for conformance with the design documents prior to <br /> a 2 or 3 week look ahead schedule that is coordinated submission and does routinely turn around submittals <br /> with the Master Construction Schedule as needed for correction before submitting to the design team <br /> to manage the daily and weekly goals for each sub. when not correct. <br /> This effort allows us to look at smaller and shorter- Clarification Requests (RFIs): Samet reviews all <br /> term specific goals to make sure subcontractors are RFIs received from a trade contractor to first make <br /> properly coordinated with each other and staying on sure we don't already know the answer based on <br /> track. the whole of the design documents before tying up <br /> the design team with review. Whenever possible, <br /> Samet also tries to provide suggested solutions and/or <br /> 9. Describe your approach to the collaboration response that can be included within budget and time <br /> with the County and the Design Team relative to for consideration. <br /> project design and materials/systems research that <br /> will assure the functional, aesthetic, and quality Bulletin Drawings: We issue bulletin drawings <br /> requirements are satisfactorily addressed for this via Procore to all trade contractors simultaneously. <br /> project. Procore also houses the whole of the Contract <br /> Documents, inclusive of supplements and current <br /> As described in the Cost Management section revisions for all parties to the construction process. <br /> above (7), Samet is fully engaged throughout the <br /> design process. We take an active role as the design Development of Cost Proposals: Samet vets all <br /> progresses through various stages and can provide Subcontractor pricing before submitting for the design <br /> advice timely to each stage of design. This often team or Owner's review. They include breakdowns <br /> includes: of labor, material, rates, and markups so as to <br /> • Feedback on the current options and decisions transparently show how those costs are built up and <br /> relative to the project control budget validate they are a reasonable estimation of what the• <br /> Performing mini cost studies to help weigh the actual costs will be. <br /> pros and cons of one option over another Identification and Justification of Change <br /> o Reaching out to trade partners or vendors for input Orders: As described in the Cost Management <br /> on options that may be in the marketplace section(7), Samet will carry allowances and <br /> o Review of schedule and/or phasing implications contingencies against specific cost risks that are <br /> from different deign options. identified within the GMP. The intent with most <br /> Change Orders is to allocate trade change costs <br /> against the places allocated within the GMP already. <br /> 10. How do you manage the time and quality When additional costs do arise that are not allocable <br /> aspects of the process of reviewing and approving to those defined budgets,justification for why it's <br /> RFQ 367-005466 /The Renovation& Construction of Sheriff's Office Facilities <br />
The URL can be used to link to this page
Your browser does not support the video tag.