Browse
Search
Agenda 06-02-2026; 8-g - Approval of a Contract with Samet Corporation for Construction Manager-At-Risk Services for the Renovation of the John M. Link, Jr. Government Services Center and Construction of the Sheriff’s Evide
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2026
>
Agenda - 06-02-2026 Business Meeting
>
Agenda 06-02-2026; 8-g - Approval of a Contract with Samet Corporation for Construction Manager-At-Risk Services for the Renovation of the John M. Link, Jr. Government Services Center and Construction of the Sheriff’s Evide
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 5:15:22 PM
Creation date
5/28/2026 5:17:54 PM
Metadata
Fields
Template:
BOCC
Date
6/2/2026
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-g
Document Relationships
Agenda for June 2, 2026 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2026\Agenda - 06-02-2026 Business Meeting
PRO-2026-027-Juneteenth Freedom Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2026
PRO-2026-028-Proclamation Recognizing June 2026 as Pride Month
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2026
PRO-2026-029- National Gun Violence Awareness Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2026
PRO-2026-030-Trails Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2026
RES-2026-037-Refund-Release resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2026
RES-2026-038-Refund-Release resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Questionnaire <br /> QUESTIONNAIRE <br /> 1. What are five major issues to be addressed in Public buildings often have more complex decision- <br /> constructing a Sheriff's Office facility? making processes than private developments. This is <br /> There are several key considerations that we driven by multiple stakeholders in a new facility and <br /> understand come up in the development of a Sheriff's authority that usually ends up being held by groups <br /> facility, and Samet is mindful of them as we progress rather than individuals. We must have reasonable <br /> both through design and construction. expectations for navigating that process. Samet works <br /> with the project team members to ensure questions <br /> 1. Security are put forward as simple options with pros/cons and <br /> o Perimeter fencing costs presented. We know that open ended questions <br /> o Access Controls (card reader system at doors) result in open ended answers, not always providing <br /> o Bulletproof partitions/glass/etc. at main entry direction we can move forward with. <br /> —protect police personnel from public Public business is publicly discoverable and <br /> 2. Back-up Power all documentation should be clear if and when <br /> o Generator System—Entire Building visible to the public. We keep this in mind for all <br /> • Uninterrupted Power Supplies (UPS's) for documentation and especially with accounting. <br /> sensitive equipment Public buildings must always have transparent <br /> 3. Evidence Storage—Maintaining Proper Chain accounting and a clear audit trail and Samet ensures <br /> of Custody our accounting records will provide the necessary <br /> o Evidence Lockers transparency for publicly funded CM at Risk projects. <br /> o Refrigerated evidence locker <br /> o High density storage 3. Describe how environmental friendly and energy <br /> • Separate exhaust systems for evidence areas efficient features were incorporated past similar <br /> (drug fumes) projects listed in your response. <br /> 4. 911 Call Center Determining which energy efficient systems are <br /> o Static dissipative carpet going to be utilized is typically driven by owner <br /> o Raised computer room flooring for 911 console preferences and design direction. Samet will very <br /> wiring often assist the design team with long term efficiency <br /> 5. Evidence Processing studies to determine the pay back timeline and true <br /> o Fume Hoods—Including dedicated exhaust and cost of such systems. Examples of this would include: <br /> make up air systems o Installation of energy efficient lighting and digital <br /> o Lab Space/Tables /Casework lighting controls that light balance the building <br /> • Sheet vinyl floor with integral cove base through the course of the day and use cycles <br /> to minimize power usage while maintaining <br /> 6. Intake/Processing adequate lighting levels. <br /> o Enclosed Sallyport o Cost studies for different types of HVAC systems <br /> o Fingerprinting/processing area for use in life cycle cost analysis by the EOR <br /> • Holding cells with tamper resistant fixtures o Water reducing pluming system such as waterless <br /> o Epoxy floors urinals, low flow fixtures and dual flush toilets. <br /> o Interview rooms with 1 way glass &recording Samet does incorporate environmentally friendly <br /> system <br /> practices into our operations. <br /> o We recycle site materials such as concrete, steel, <br /> 2. Provide an overview of your teams philosophy in cardboard, and others when local resources are <br /> the construction of a major public building. available. <br /> There are a few key differences our project team ° We use low energy temp lighting. <br /> must keep in mind in the management of major public ° We source local materials and local fabrication <br /> work and ensure the necessary controls are in place to whenever possible and practical as part of the <br /> properly manage them. <br /> procurement strategy. <br /> RFQ 367-005466 /The Renovation& Construction of Sheriff's Office Facilities <br />
The URL can be used to link to this page
Your browser does not support the video tag.