Orange County NC Website
Project Aproach <br /> BA. / BUILDING INFORMATION MODELING (BIM) <br /> OVERVIEW management, and allocation of risk must be addressed <br /> To ensure a seamless transition from the project's <br /> at this early stage. Samet will lead these discovery <br /> design phases to the construction phase, we will sessions, document the outcome, and follow through <br /> utilize BIM as a tool to build, analyze, and resolve by implementing the results. <br /> construction issues in a digital environment prior to 2. Virtual Design <br /> actual construction. <br /> The ability to work in a digital environment allows The architects and design consultants developthe project's design in three dimensions, as 3D <br /> for flexibility in information exchange and promotes <br /> better communication among the project team. representations of the project's program. Reports <br /> As a collaborative tool,the BIM process requires from the database become the primary design tool. <br /> strong oversight and management to ensure that all The database is accessed graphically, with changes <br /> stakeholders are on-board. BIM is based on a culture made in one location but reflected in all schedules <br /> of sharing and retaining knowledge throughout the and graphic views. Graphical representations provide <br /> process. Various technologies are available to the visuals for the team to easily check against design <br /> design community; Samet uses AutoDesk Revit intent and solve technical problems early in the <br /> technology as a platform, and Navisworks for clash process with improved collaboration between multiple <br /> detection and collaboration with other model formats. design disciplines. Samet's preconstruction services <br /> are integrated at this stage with constructability <br /> Samet can help maximize these benefits through analysis, cost estimating, and Value Engineering <br /> oversight and management of the BIM process. processes. <br /> We obtain the best value of using this technology <br /> when incorporated early in our projects, and to help 3. Clash Detection <br /> facilitate the process we use a collaborative approach. Samet will run the model through Clash Detection <br /> Should the project team determine that BIM is an processes, checking for conflicts between systems <br /> appropriate tool for your project, we would employ a and ensuring all elements fit within the allotted <br /> three-step approach: spaces. Interference Reports clearly show conflicts <br /> 1. Establish Expectations in the design, allowing early resolution. This is <br /> especially helpful in preventing conflicts between <br /> The BIM Model is an important collaborative tool structural elements and the Mechanical, Electrical <br /> for the design and execution of the project. The first and Plumbing (MEP) and Fire Suppression systems. <br /> step in managing this process is to determine what the Design errors and omissions are discovered early, <br /> team wishes to achieve through the use of the model. before construction begins, and potential problems <br /> The team must identify the design and detailing are minimized during construction, saving time and <br /> functions to be performed and determine which money. Input from the major trade subcontractors— <br /> elements can be professionally and economically mechanical, electrical,plumbing, fire suppression, <br /> accomplished at all levels, from the architect through curtain wall, steel,precast concrete—can be built <br /> the subcontractors and suppliers. Legal issues and into the model to improve energy efficiency, find cost <br /> obligations, such as who owns the model, information savings, or improve the design. <br /> IL <br /> 1000 <br /> RFQ 367-005466 /The Renovation& Construction of Sheriff's Office Facilities <br />