Browse
Search
Agenda 06-02-2026; 8-g - Approval of a Contract with Samet Corporation for Construction Manager-At-Risk Services for the Renovation of the John M. Link, Jr. Government Services Center and Construction of the Sheriff’s Evide
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2026
>
Agenda - 06-02-2026 Business Meeting
>
Agenda 06-02-2026; 8-g - Approval of a Contract with Samet Corporation for Construction Manager-At-Risk Services for the Renovation of the John M. Link, Jr. Government Services Center and Construction of the Sheriff’s Evide
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 5:15:22 PM
Creation date
5/28/2026 5:17:54 PM
Metadata
Fields
Template:
BOCC
Date
6/2/2026
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-g
Document Relationships
Agenda for June 2, 2026 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2026\Agenda - 06-02-2026 Business Meeting
PRO-2026-027-Juneteenth Freedom Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2026
PRO-2026-028-Proclamation Recognizing June 2026 as Pride Month
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2026
PRO-2026-029- National Gun Violence Awareness Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2026
PRO-2026-030-Trails Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2026
RES-2026-037-Refund-Release resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2026
RES-2026-038-Refund-Release resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Aproach <br /> BA. / BUILDING INFORMATION MODELING (BIM) <br /> OVERVIEW management, and allocation of risk must be addressed <br /> To ensure a seamless transition from the project's <br /> at this early stage. Samet will lead these discovery <br /> design phases to the construction phase, we will sessions, document the outcome, and follow through <br /> utilize BIM as a tool to build, analyze, and resolve by implementing the results. <br /> construction issues in a digital environment prior to 2. Virtual Design <br /> actual construction. <br /> The ability to work in a digital environment allows The architects and design consultants developthe project's design in three dimensions, as 3D <br /> for flexibility in information exchange and promotes <br /> better communication among the project team. representations of the project's program. Reports <br /> As a collaborative tool,the BIM process requires from the database become the primary design tool. <br /> strong oversight and management to ensure that all The database is accessed graphically, with changes <br /> stakeholders are on-board. BIM is based on a culture made in one location but reflected in all schedules <br /> of sharing and retaining knowledge throughout the and graphic views. Graphical representations provide <br /> process. Various technologies are available to the visuals for the team to easily check against design <br /> design community; Samet uses AutoDesk Revit intent and solve technical problems early in the <br /> technology as a platform, and Navisworks for clash process with improved collaboration between multiple <br /> detection and collaboration with other model formats. design disciplines. Samet's preconstruction services <br /> are integrated at this stage with constructability <br /> Samet can help maximize these benefits through analysis, cost estimating, and Value Engineering <br /> oversight and management of the BIM process. processes. <br /> We obtain the best value of using this technology <br /> when incorporated early in our projects, and to help 3. Clash Detection <br /> facilitate the process we use a collaborative approach. Samet will run the model through Clash Detection <br /> Should the project team determine that BIM is an processes, checking for conflicts between systems <br /> appropriate tool for your project, we would employ a and ensuring all elements fit within the allotted <br /> three-step approach: spaces. Interference Reports clearly show conflicts <br /> 1. Establish Expectations in the design, allowing early resolution. This is <br /> especially helpful in preventing conflicts between <br /> The BIM Model is an important collaborative tool structural elements and the Mechanical, Electrical <br /> for the design and execution of the project. The first and Plumbing (MEP) and Fire Suppression systems. <br /> step in managing this process is to determine what the Design errors and omissions are discovered early, <br /> team wishes to achieve through the use of the model. before construction begins, and potential problems <br /> The team must identify the design and detailing are minimized during construction, saving time and <br /> functions to be performed and determine which money. Input from the major trade subcontractors— <br /> elements can be professionally and economically mechanical, electrical,plumbing, fire suppression, <br /> accomplished at all levels, from the architect through curtain wall, steel,precast concrete—can be built <br /> the subcontractors and suppliers. Legal issues and into the model to improve energy efficiency, find cost <br /> obligations, such as who owns the model, information savings, or improve the design. <br /> IL <br /> 1000 <br /> RFQ 367-005466 /The Renovation& Construction of Sheriff's Office Facilities <br />
The URL can be used to link to this page
Your browser does not support the video tag.