Browse
Search
Agenda 06-02-2026; 8-g - Approval of a Contract with Samet Corporation for Construction Manager-At-Risk Services for the Renovation of the John M. Link, Jr. Government Services Center and Construction of the Sheriff’s Evide
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2026
>
Agenda - 06-02-2026 Business Meeting
>
Agenda 06-02-2026; 8-g - Approval of a Contract with Samet Corporation for Construction Manager-At-Risk Services for the Renovation of the John M. Link, Jr. Government Services Center and Construction of the Sheriff’s Evide
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 5:15:22 PM
Creation date
5/28/2026 5:17:54 PM
Metadata
Fields
Template:
BOCC
Date
6/2/2026
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-g
Document Relationships
Agenda for June 2, 2026 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2026\Agenda - 06-02-2026 Business Meeting
PRO-2026-027-Juneteenth Freedom Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2026
PRO-2026-028-Proclamation Recognizing June 2026 as Pride Month
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2026
PRO-2026-029- National Gun Violence Awareness Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2026
PRO-2026-030-Trails Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2026
RES-2026-037-Refund-Release resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2026
RES-2026-038-Refund-Release resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project�A�proach <br /> For each of these groups, the QA/QC program a dry building when complete. Samet will buyout <br /> identifies all the required documentation, material all the skin related trades early with a heavy push <br /> verification, inspections, and testing required to to get all submittal data and drawings to the design <br /> ensure our Owner's project meets the applicable team for review. We then schedule a"Building <br /> standards. Envelope"review meeting including all affected trade <br /> Elements of our QA/QC program would include: contractors, the architect, any envelope consultants, <br /> • Ensure Submittals meet the Specifications and and the Owner's facilities management if they desire <br /> Documentations. to participate. <br /> • Holding a Pre-installation meeting to discuss During this review meeting, the exterior of the <br /> quality expectations and define inspections/testing building is methodically reviewed from the ground <br /> for each trade scope. This should include the up, looking at all transitions between elements, <br /> O/A/E when appropriate. flashing details, windows, doors, air and vapor <br /> • Use of mockups as appropriate or required. barriers, waterproofing, caulks, roofing systems, <br /> o Inspect/Verify material and equipment when penetrations etc. Each transition is reviewed in <br /> arriving on site, documented in ProCore. context of the shop drawings and trades involved: <br /> o Inspection of Ist instance of installation and o All parties involved in a dry building can speak to <br /> ongoing inspections as agreed/required, their area of expertise to resolve detailing issues <br /> documented in ProCore. and ensure compatibility. <br /> • Material and Performance testing as required, o We find missing details before construction <br /> documented in ProCore. begins. <br /> o Progress Photos - Includes pre-coverup photos/ o All trades have a voice, and concerns aren't <br /> videos. missed when being addressed. <br /> o As-Built Drawings o RFIs are created with proposed answers to <br /> All QA/QC related elements are fully documented document changes or needed details. <br /> in Procore for the project team to review. Inspection Additionally Samet ensures ALL building elevations <br /> results, observations, and non-conformances are are inspected, verified, and documented to be correct <br /> assigned to the relevant trade. Each trade must make at each successive "layering" of waterproofing trade. <br /> corrections and upload photographs to the extent Each system is verified once complete and prior to <br /> applicable, documenting the correction was made coverup. We also discuss with our designers and <br /> and this is in turn verified by Samet. We encourage trade partners where water testing is prudent to <br /> all designers, engineers, owners, and third party ensure systems are acting as they are intended. <br /> inspectors to utilize Procore for logging quality <br /> concerns or issues, resulting in a comprehensive SCHEDULE <br /> documented verification that no QA/QC concerns are Samet uses Primavera P6 for all project scheduling <br /> left unresolved. This also allows the Project Team and utilizes in house scheduling experts. Our <br /> to easily review and consider if assessment against Raleigh region scheduler and will develop a fully <br /> a specific trade contractor's pay app is appropriate detailed and phased construction schedule during the <br /> based on their attentiveness to quality management. bidding process. Upon project award and buyout, the <br /> scheduler will meet with the Senior Super and key <br /> Samet is committed to building trade contractors to make final adjustments within <br /> the allotted timeline to produce a final official project <br /> Quality Management into every schedule. <br /> step of our process and ensuring We will visit the project site twice a month to update <br /> the project schedule with the field team, and those <br /> Orange County receives a updates will be included with the project reporting <br /> discussed elsewhere. Any subs who are falling <br /> building without quality issues behind will be noted and an action plan developed for <br /> when complete. recovery. <br /> Water Intrusion is a critical component of the <br /> Quality Management process. <br /> The management of it is unique and utilizes a <br /> holistic review of those systems to ensure we have <br /> RFQ 367-005466 /The Renovation& Construction of Sheriff's Office Facilities <br />
The URL can be used to link to this page
Your browser does not support the video tag.