Browse
Search
Agenda 06-02-2026; 8-g - Approval of a Contract with Samet Corporation for Construction Manager-At-Risk Services for the Renovation of the John M. Link, Jr. Government Services Center and Construction of the Sheriff’s Evide
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2026
>
Agenda - 06-02-2026 Business Meeting
>
Agenda 06-02-2026; 8-g - Approval of a Contract with Samet Corporation for Construction Manager-At-Risk Services for the Renovation of the John M. Link, Jr. Government Services Center and Construction of the Sheriff’s Evide
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 5:15:22 PM
Creation date
5/28/2026 5:17:54 PM
Metadata
Fields
Template:
BOCC
Date
6/2/2026
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-g
Document Relationships
Agenda for June 2, 2026 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2026\Agenda - 06-02-2026 Business Meeting
PRO-2026-027-Juneteenth Freedom Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2026
PRO-2026-028-Proclamation Recognizing June 2026 as Pride Month
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2026
PRO-2026-029- National Gun Violence Awareness Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2026
PRO-2026-030-Trails Day Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2026
RES-2026-037-Refund-Release resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2026
RES-2026-038-Refund-Release resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Qualifications & E6 perience <br /> BOILING SPRING LAKES POLICE DEPARTMENT RENO. PROJECT DELIVERY <br /> SOUTHPORT, NC Design-Build <br /> The city purchased an existing 2,617 SF one-story building requiring SIZE <br /> Samet's help to transform the former bank/office into a modern facility fit for 5,427 SF/2,617 SF renovation <br /> a police department. • 1 SF addition <br /> The renovation included the addition of a public entrance with a covered YEAR COMPLETED <br /> entryway, lobby, accessible restrooms, and secure access to the receptionist 2023 <br /> and conference room. The design features separate secure entrances for <br /> staff and on-duty officers and additional office spaces. Key interior upgrades OWNER <br /> include secure evidence processing and storage spaces, locker rooms, City Boiling Spring <br /> restrooms, showers, a break room with a kitchenette, and emergency power ' Boiling Spring <br /> 910.363.0025 <br /> provisions during natural disasters. <br /> ARCHITECT <br /> PRECON. SERVICES CONST. SERVICES REFERENCE <br /> : •llars, Owner, • • <br /> Precon Mgmt Proj Schedule Dev Three Proj Dev/Design Value Analysis (RFIs/Subst) Front Wilmington,321 N. <br /> Value Analysis Cost Control Mgmt ;, 1 <br /> Precon Schedule Trade Contractor Mgmt <br /> Constructability Review Shop Drawing Rev/Proc ; • <br /> Cost Modeling Prod Control/Staffing 910.269.3024 <br /> Contract Docs Coord On-Site Coord/Mgmt 1 ' <br /> GMP Const Proj Meetings $1,520,948 <br /> Contingency Dev Quality Control/Inspections <br /> Trade Contractor Prequal Proj Safety (No Lost Time) PRECON. <br /> Contractor Reporting 1.5% <br /> Contract Close-Out CONSTRUCTION <br /> IT <br /> _ I 1 <br /> 1 <br /> 1 ' <br /> ' 1 <br /> 1 ' <br /> 1 <br /> RFQ 367-005466 /The Renovation& Construction of Sheriff's Office Facilities <br />
The URL can be used to link to this page
Your browser does not support the video tag.