The Renovation and Construction of Orange County Sheriff's Office QSAMET <br /> & Evidence Storage Building Hillsborough, NC <br /> Samet Project#26-710 Date:January 291h, 2026 <br /> vii) A project outreach event will be held close to the project site to promote the project <br /> including review of the design, project scope of work, bid packages, schedule, bid <br /> requirements, etc. on or before the establishment of the CD Estimate/GMP.This initial <br /> meeting will serve as an informational meeting of what is to come once the project is <br /> formally advertised for bids. <br /> viii) Project Specific Trade Partner(Subcontractor/Supplier) Pre-qualification Process—As <br /> required by NC State Legislation (HB 1043),the Construction Manager in conjunction with <br /> Orange County representatives will establish "objective" pre-qualification criteria/forms/ <br /> scoring matrix to be used by the CM for submission to respective trade subcontractors/ <br /> suppliers for review and preparation of their pre-qualification response. Solicitation, <br /> processing, and evaluation of subcontractor/supplier pre-qualification information as <br /> received from respective trade contractors/suppliers will be undertaken by the <br /> Construction Manager during the Preconstruction Phase of this project. <br /> Renovation and Construction of Sheriff's Office Facilities& Evidence Storage <br /> RE: RFQ#367-005466 <br /> Hillsborough, NC Preconstruction Duration: 56 Weeks <br /> Project No. 26-710 Total Construction Budget: $19,344,576 <br /> Construction Budget Breakdown Summary below: <br /> Project: Location: Budget: <br /> Sheriff's HQ at Link Center 200 South Cameron Street $16,914,576 <br /> Hillsborough, NC <br /> Sheriff's Office Evidence Storage Bldg. 1200 US Hwy 70 North $2,430,000 <br /> Hillsborough, NC <br /> Total Construction Budget: $19,344,576 <br /> DESCRIPTION OF WORK-Preconstruction Scope of Work/Deliverables: TOTAL <br /> Section 2A-Schematic Cost Estimate/Value Analysis/Constructability Review $52,651.00 <br /> (5 weeks for Estimate Deliverable from receipt of Design Deliverable) <br /> Section 2B-Design Development. Cost Estimate/Value Analysis/Constructability Review $55,563.00 <br /> (6 weeks for Estimate Deliverable from receipt of Design Deliverable) <br /> Section 2C-CD Estimate/GMP Development/Value Analysis/Constructability Review/SOW/ $59,825.00 <br /> Project Manual/Bidding(5 weeks for Estimate Deliverable from receipt of Design Deliverable) <br /> Section 2D-HUB Program& Project Specific Trade Partner Pre-Qualification Process $25,300.00 <br /> (Occurs after DD Estimating Deliverable, during CD design) <br /> Total Preconstruction Services Cost: $193,339.00 <br /> Preconstruction Services Scope of Work,Page 4 of 4 <br />