Browse
Search
Agenda 06-02-2026; 8-h - Approval of Construction Contract Award - Electric Vehicle Charging Station (EVCS) Installation Project at the Orange Transportation Services Facility
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2026
>
Agenda - 06-02-2026 Business Meeting
>
Agenda 06-02-2026; 8-h - Approval of Construction Contract Award - Electric Vehicle Charging Station (EVCS) Installation Project at the Orange Transportation Services Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 5:15:35 PM
Creation date
5/28/2026 5:04:25 PM
Metadata
Fields
Template:
BOCC
Date
6/2/2026
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-h
Document Relationships
Agenda for June 2, 2026 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2026\Agenda - 06-02-2026 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> [Departmental Use Only] <br /> TITLE OPT EVCS <br /> FY 2025-2026 RFP5477 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT OVER $250,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement"), made as of the 3rd day of <br /> June, 2026, by and between Stelco Electric, LLC, (hereinafter called the "Contractor"), and Orange County, a <br /> political subdivision of the State of North Carolina, (hereinafter called the "County," "Orange County," or <br /> "Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the General Conditions which are fully <br /> incorporated in this Agreement, the Request for Proposals, designer approved communications and field <br /> orders, the Proposal, Construction Documents and Drawings and Written Specifications. The Contract <br /> Documents form the Contract. In the event of any inconsistency between or among the Contract Documents <br /> the Contract Documents shall be interpreted in the following order of priority: <br /> a. This Agreement and incorporated General Conditions attached as Exhibit 1. <br /> b. Designer approved and stamped construction documents and drawings and written <br /> specifications. <br /> c. Designer approved communications and field orders. <br /> d. Request for Proposals and addenda thereto. <br /> e. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform, and be fully responsible <br /> for all of the Work required by this Agreement within the time period stipulated in a written Notice-to-Proceed <br /> to be executed by the Contractor and Owner and in accordance with the following enumerated documents, <br /> which are made a part hereof as if fully contained herein: <br /> a. Construction Drawings prepared by EquaGen Engineers (Sheet EVCS Option 1 dated <br /> 9/17/2025 only as required with the reduced scope of work per Stelco Electric, LLC's revised <br /> proposal.) <br /> b. Written specifications prepared by the Designer. <br /> c. Stelco Electric, LLC proposal dated May 15, 2026 which fully describes the work to be <br /> Revised 01/24 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.