Browse
Search
Agenda 06-02-2026; 8-h - Approval of Construction Contract Award - Electric Vehicle Charging Station (EVCS) Installation Project at the Orange Transportation Services Facility
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2026
>
Agenda - 06-02-2026 Business Meeting
>
Agenda 06-02-2026; 8-h - Approval of Construction Contract Award - Electric Vehicle Charging Station (EVCS) Installation Project at the Orange Transportation Services Facility
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 5:15:35 PM
Creation date
5/28/2026 5:04:25 PM
Metadata
Fields
Template:
BOCC
Date
6/2/2026
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-h
Document Relationships
Agenda for June 2, 2026 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2026\Agenda - 06-02-2026 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br /> S7ELCO <br /> E L E C T R I C , L L C <br /> 4812 Starcrest Dr,Monroe, NC 28110 <br /> Phone: (980) 313-8206 1 estimating@stelco-electric.com I www.stelco-electric.com <br /> NC 03408-U <br /> May 14,2026 <br /> Re: Electrical Proposal-Orange County EV <br /> To Whom It May Concern, <br /> Stelco is pleased to quote the electrical installation for this project. Our price is based on the <br /> Electrical pages of the drawings.Any work shown on pages other than the electrical pages are <br /> assumed to be by others unless otherwise noted <br /> Base PROPOSAL AMOUNT(installation of 3 EV chargers and a 450kw power unit with a two- <br /> year warranty) <br /> Seven Hundred Five Thousand ($705,000.00) <br /> With payment(s)to be made as follows: Net 30. <br /> SCOPE OF WORK INCLUDED <br /> Provide and install 3 charging stations as plans show <br /> Includes the purchase of the 450kW solution which can be used for the 3 chargers now <br /> and during the second phase when the other 2 chargers are purchased two power <br /> modules can be purchased to accommodate. We will have conduit stubs at the future <br /> units to make the installation simple. <br /> Excluding the 5-year warranty extended, we have removed this and used the standard <br /> 2-year warranty to fit the budget. <br /> All material is guaranteed to be as specified unless changed or substituted by Owner or <br /> Owner's Representative.All work shall be executed in a workmanlike manner in accordance <br /> with accepted standard practices.Any alterations or deviations from the contract plans and <br /> specifications involving additional or extra costs will be executed only upon written <br />
The URL can be used to link to this page
Your browser does not support the video tag.