|
Qualifications & Experience
<br /> 9.B. / RESUMES g
<br /> Tyler has 25 years of experience professionally managing projects,
<br /> business development, and operations. He has expert skills in field
<br /> operations, financial/cost analysis, personnel supervision, marketing and
<br /> contract management. Tyler manages the operations of Samet's Triangle
<br /> Office. Tyler will provide overall project direction for your facility. He
<br /> will, also, manage the project team from the initial design phase until
<br /> construction completion.
<br /> EXPERIENCE
<br /> WCPSS STEM Early College, Cary, NC / 30,000 SF educational facility.
<br /> Interior renovation including partitions, finishes, casework, and modern
<br /> MEPF systems. Exterior improvements: entrance canopies, storefront
<br /> and brickwork repairs, and roofing replacement. Site work: parking lot
<br /> reconfiguration,utility updates, asphalt replacement, and addition of a
<br /> TYLERbasketball court and landscaping. /Senior Vice President
<br /> KELLEY 137 Franklin Office, Chapel Hill,NC / 131,808 SF Franklin Office project
<br /> renovated 136 Rosemary(seven-story) and 137 Franklin (three-story) with
<br /> SENIOR VICE demolition, hazmat abatement, and roof coatings. Phase II included new
<br /> PRESIDENT core and MEP systems, full envelope replacement, and an expanded scope
<br /> CAREER after a year-long pause, resulting in modernized buildings with updated
<br /> 25 years fagades and common areas. /Senior Vice President
<br /> SAMET EXPERIENCE Rosemary Street Parking Deck, Chapel Hill,NC/365,043 SF, seven-level,
<br /> 8 years 1,100-space precast parking deck. It includes a ground-level porch,multiple
<br /> entry points,a driveway extension,and a 30-foot utility easement for realigned
<br /> OFFICE LOCATION storm and sewer lines./Senior Vice President
<br /> Raleigh, SC Novus, Durham,NC /27-story, 617,580 SF mixed-use building with 242
<br /> CREDENTIALS units, including 188 apartments and 54 condos. It features ground-floor
<br /> OSHA 3o Hour retail and below-grade parking. /Senior Vice President
<br /> ASHE Certified Millennium Chapel Hill, Chapel Hill, NC /This 325,170 SF mixed-use
<br /> project includes 202 multi-family apartment units and a precast parking
<br /> garage. /Senior Vice President
<br /> District @ 54, Raleigh, NC /This building is home to 330 units in a single
<br /> 5-story complex delivered in phases. There is 272,800 SF of net building
<br /> space, approximately 298,305 SF of heated livable space and 8,732 SF
<br /> of non-residential/amenity space on the first floor. The 5-story, pre-cast
<br /> parking deck is 171,592 SF with a mezzanine level containing 531 parking
<br /> spaces. /Senior Vice President
<br /> Sweetwater Mixed Use, Apex,NC / Sweetwater Mixed-Use is a
<br /> thoughtfully designed 429,804 SF community with retail space and 2
<br /> parking garages. /Senior Vice President
<br /> Project FXGD,New Hill,NC /This project includes design/build turnkey
<br /> delivery of a 337,000 SF shipping & distribution facility for a major
<br /> national freight carrier. The 57.8-acre site includes paving of over 19
<br /> acres including heavy-duty asphalt paving, heavy-duty concrete paving,
<br /> employee parking, and significant storage areas for trucks, trailers, and
<br /> Affff SAMET vans. /Senior Vice President
<br /> RFQ 367-005466 /The Renovation& Construction of Sheriff's Office Facilities
<br />
|