Browse
Search
Agenda 06-02-2026; 8-g - Approval of a Contract with Samet Corporation for Construction Manager-At-Risk Services for the Renovation of the John M. Link, Jr. Government Services Center and Construction of the Sheriff’s Evide
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2026
>
Agenda - 06-02-2026 Business Meeting
>
Agenda 06-02-2026; 8-g - Approval of a Contract with Samet Corporation for Construction Manager-At-Risk Services for the Renovation of the John M. Link, Jr. Government Services Center and Construction of the Sheriff’s Evide
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 5:15:22 PM
Creation date
5/28/2026 5:00:47 PM
Metadata
Fields
Template:
BOCC
Date
6/2/2026
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-g
Document Relationships
Agenda for June 2, 2026 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2026\Agenda - 06-02-2026 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Questionnaire <br /> 81 <br /> Management of the Control Budget is paramount to <br /> • Reduced cost to the Owner: When consideration successful Preconstruction effort. We stay engaged <br /> of an alternate product can bring savings back to with the project team throughout the design process <br /> the Owner we would bring those to the team for and utilize the principals of Target Value Design, <br /> review. providing input for the team to make decisions that <br /> o Convenience of the Subcontractor: We ask keep the design on target and understand cost or <br /> Subcontractors to bring convenience substitution schedule implications of the decisions being made. <br /> requests forward during the bidding phase. Further, Samet has In-house MP&E preconstruction <br /> Subcontractors should not be include alternative expertise who can provide more detailed insight <br /> products in their bid, making them more into those trades and a more detailed evaluation of <br /> competitive, without obtaining approval in proposals received. <br /> advance. A significant key difference in our role as a <br /> We ask and expect our Subcontractors to provide an Construction Manager, is our final GMP should <br /> evaluation of the differences between a substitution anticipate costs required to complete the scope <br /> and the original specified product. Samet will review and intent of the project as it is described on the <br /> this evaluation as any other submittal and consider documents. Samet uses or detailed knowledge of <br /> potential conflicts with other trades. Ultimately we the project obtained throughout the preconstruction <br /> request the Design Team review the substitution process, together with our experience and expertise <br /> and approve as a variance to be compatible with the to ensure we have included specific allowances or <br /> greater design and design intent. contingencies for work scope that is typically not <br /> definable or quantifiable at the time of bidding to the <br /> trades. These budgets are then transparently managed <br /> 7. Describe how the team would provide cost to the benefit of the Owner. <br /> management services on this project using the CM <br /> at Risk delivery method. How would you reconcile Ultimately, at Samet our GMP's are built to <br /> differences between your cost estimates and those minimize change orders, unless it is initiated by <br /> prepared by the Design Team?Provide the cost model a change in scope to the project, or caused by <br /> format used on one of the four similar completed unforeseen or concealed conditions. <br /> projects listed in your response. Potential Change Order Logs are maintained <br /> Samet will typically produce 3 estimates for the weekly and issued to the Owner and Architect either <br /> Project based on the documents and information bi-weekly or monthly depending on the contract and <br /> provided by the Design Team. Clarifications and discussions with the project team. These logs are <br /> assumptions when appropriate will be itemized in the inclusive of: <br /> estimate's documentation. o Costs charged to Contract Allowances or <br /> • Schematic Design Estimate: Produced around Construction Contingency <br /> 20-30% design, this establishes a baseline Control o The incorporation of an Architect's ASI or other <br /> Budget to be carried through the design process. design directive (Whether$0 or cost incurring) <br /> All future estimates, or pricing exercises will o Resulting from an Owner request to change the <br /> reference back to the Control Budget. If there project scope. <br /> are any differences between our estimate and the In distributing these logs on an agreed and regular <br /> design team estimate they are resolved at this basis, we provide the team the opportunity to <br /> stage and incorporated in the Control Budget. comment or question conditions which affect the <br /> • Design Development Estimate: Produced at— 50- project's final cost. Our goal is for the Owner or <br /> 60% design to ensure the design Architect to have as much time as possible when <br /> • Construction Documents Estimate: This estimate decisions may still be made to alter those conditions <br /> forms the basis for the GMP and sets the budget to and eliminate "surprise" events after the fact. <br /> be followed through the construction phase of the <br /> project. <br /> 8. Explain the management tools, techniques and <br /> Each of the above estimates will include the procedures the firm uses to monitor and maintain the <br /> following documents: construction phase schedule. <br /> • Estimate Summary by Construction Division <br /> o Estimate Detail with in-house takeoffs All project schedules are developed using <br /> o Clarifications and Qualifications Primavera P6 Scheduling Software and the Critical <br /> o Value Engineering Log, Cost Variance Log, Path Methodology. Samet uses in house full time <br /> Allowance Log scheduling engineers in the development and <br /> RFQ 367-005466 /The Renovation& Construction of Sheriff's Office Facilities <br />
The URL can be used to link to this page
Your browser does not support the video tag.