Orange County NC Website
ProjeVA�pPrl� <br /> CONSTRUCTABILITY Detail from Day 1 bt�5 <br /> Samet's goal is to review, identify and mitigate as Our experience and seasoned group of in-house <br /> many of the potential constructability issues before estimators gives Samet the advantage of knowing <br /> the documents are finalized. When constructability where the design is heading before it gets put on <br /> issues are identified once a project is in the field, we paper, so we apply our knowledge to the benefit of <br /> take a comprehensive TEAM approach in reaching our customer by developing a detailed estimate (e.g. <br /> a resolution that protects the projects schedule and 10-12 pages of detail) from the Schematic Stage, <br /> avoids additional costs to the Owner. Samet brings where others will not develop the detail until well into <br /> years of construction experience and countless Design Development. More detail at an earlier stage <br /> "lessons learned" from past projects to the table drives better dialogue among all partners, allowing <br /> before documents are finalized. for informed scope and value decisions months earlier <br /> We bring 3D knowledge and experience to the 2D in the design process. <br /> drawings. A 2D detail or elevation doesn't show if Thoughtful Layout& Breakdowns for Maximum <br /> something can actually be built in the field, but our Analysis <br /> experienced builders can. We work with each client and design team at the <br /> outset of our work to set the estimate layout up and <br /> "Samet has provided the most break scope down as the team desires, not just how <br /> we always do it. Our Estimate setups offer great <br /> thorough set of review comments flexibility and maximum opportunity for analysis. <br /> on our n desi documents that I Whereas most CMs offer one method of scope <br /> g breakdown, we gladly provide estimates broken <br /> have ever seen. It is refreshing to down by Area (e.g. Energy Plant, Educational Space, <br /> Site/Exteriors or other desired breakdown), by CSI/ <br /> see a Contractor care as much as Specifications, by UniFormat/Systems, and by Bid <br /> the do t0 et the detailon Packaging all in a single, clear, concise estimate <br /> y g s right layout. The estimate can easily be re-organized to <br /> the front end of the project." help tackle the challenge of the day as we proceed <br /> together through the design progression. <br /> Careful planning and crafting of detailed,project- QUALITY CONTROL <br /> specific scopes of work ensures all aspects of the work Samet's Quality Control Program is developed and <br /> are covered on bid day and scope gaps are eliminated organized around the "5 Never Fails" This system <br /> prior to subcontract award. breaks down the QA/QC program into the key <br /> elements of a construction process so they can each be <br /> ESTIMATING THE SAMET WAY methodically managed utilizing the existing PM tools <br /> Below we describe the milestone estimating we have on board. <br /> process. Here are some differentiators of the Samet <br /> Estimating approach that separate us from the © © <br /> competition: <br /> Continuous Engagement& Cost Updates STRU STEEL <br /> •�. � CONCRPETEETETTILT-UP <br /> WOOD FRAMING <br /> Although we deliver milestone estimate packages MASONRY <br /> at the prescribed stages, the Samet team goes <br /> above-and-beyond by staying engaged in the design SITE CONTROLS BALCONIES+ROO <br /> FOOTINGS WINDOWS+DOORS <br /> GRADING <br /> progression meetings and scope decision-making AIR BARRIERS <br /> processes in between design milestones. We "ride UTILITIES P . PROTECTION <br /> along"throughout the design process to offer input, <br /> suggestions, constructability advice, and critically, to <br /> SYSTEMS <br /> maintain an updated/real-time cost estimate, so then <br /> overall team is never left guessing about where the <br /> number is at and how it compares to the budget. rjNEVER FAIL <br /> RFQ 367-005466 /The Renovation& Construction of Sheriff's Office Facilities Comm <br />