Browse
Search
Agenda 06-02-2026; 8-g - Approval of a Contract with Samet Corporation for Construction Manager-At-Risk Services for the Renovation of the John M. Link, Jr. Government Services Center and Construction of the Sheriff’s Evide
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2026
>
Agenda - 06-02-2026 Business Meeting
>
Agenda 06-02-2026; 8-g - Approval of a Contract with Samet Corporation for Construction Manager-At-Risk Services for the Renovation of the John M. Link, Jr. Government Services Center and Construction of the Sheriff’s Evide
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 5:15:22 PM
Creation date
5/28/2026 5:00:47 PM
Metadata
Fields
Template:
BOCC
Date
6/2/2026
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-g
Document Relationships
Agenda for June 2, 2026 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2026\Agenda - 06-02-2026 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Qualifications & Experience <br /> 10 / LEED PROJECTS 5 <br /> PROJECT <br /> Life Community Church Certified Certified <br /> BD Diagnostics - TriPath GoldG� old <br /> JSNN Construction Certified Gold <br /> Tower Village II Silver Silver <br /> Greensboro Ballpark Silver Silver <br /> Shops @ Southline Silver Silver <br /> HPU Student Exemplorary Cntr Silver Silver <br /> Elon-Administration Bldg Silver Silver <br /> McEwen DiningHall Silver Silver <br /> BD Expansion Silver Certified Silver <br /> LiNK Montford Phase 2 NGBS Bronze NGBS Bronze <br /> LoSo Village NAHB Silver NAHB Silver <br /> Elon Engineering Bldg Gold Gold <br /> Amgen Fit Up Gold Gold <br /> Ferguson Raleigh Ship Hub Silver Silver <br /> VA Fayetteville Project _ Certified Silver <br /> CDI Construction Phase Certified Silver <br /> WSSU DJR SAC Const Gold Gold <br /> GTCC Cameron Campus Silver Silver <br /> UNCG Spartan Village Ph 1 Con Silver Silver <br /> Profess & Comm Ed. Center Gold Gold <br /> OUR APPROACH TO COST EVALUATION F A <br /> Early Integration PREMIUMOBSERVED COST <br /> We work closely with the design team during <br /> schematic and design development phases to identify Based • ' ' ' project <br /> credits that align with the project's goals and budget. experience, cost <br /> This proactive approach minimizes redesign and ' of total <br /> avoids costly late-stage changes. construction cost, depending on the targetedlevel <br /> Target Value Design and complexity of the project. Projects aiming <br /> For each major building system—HVAC, envelope, premiumfor LEED Silver often achieve certification with <br /> lighting—we evaluate options that contribute to sustainableminimal <br /> practices are <br /> LEED points while balancing first cost and life- integrated early, while Gold or <br /> cycle performance. This includes analyzing energy may requireadditional advanced <br /> efficiency measures, water-saving fixtures, and systems or ' ' " energy. <br /> material selections. <br /> Market Intelligence <br /> We leverage current pricing data and trade partner <br /> LEED CERTIFIED <br /> input to estimate cost impacts of sustainable features. <br /> LEE <br /> For example, high-efficiency mechanical systems or PROJECTS <br /> low VOC materials often carry modest premiums, <br /> while renewable energy systems can represent a larger 20 <br /> investment. .. . . . . . . . . . . . . . . . . . . . . . . . "I I 1 11. <br /> Collaborative Decision-Making LEED A <br /> Instead of presenting sustainability as a fixed cost, <br /> we provide owners with a menu of strategies, each <br /> with estimated cost implications and operational <br /> benefits. This allows informed decisions about <br /> which certification level—Certified, Silver, Gold, or 25 ASSOCIATES <br /> Platinum—offers the best value. <br /> RFQ 367-005466 /The Renovation& Construction of Sheriff's Office Facilities <br />
The URL can be used to link to this page
Your browser does not support the video tag.