Browse
Search
Agenda 06-02-2026; 8-g - Approval of a Contract with Samet Corporation for Construction Manager-At-Risk Services for the Renovation of the John M. Link, Jr. Government Services Center and Construction of the Sheriff’s Evide
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2026
>
Agenda - 06-02-2026 Business Meeting
>
Agenda 06-02-2026; 8-g - Approval of a Contract with Samet Corporation for Construction Manager-At-Risk Services for the Renovation of the John M. Link, Jr. Government Services Center and Construction of the Sheriff’s Evide
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 5:15:22 PM
Creation date
5/28/2026 5:00:47 PM
Metadata
Fields
Template:
BOCC
Date
6/2/2026
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-g
Document Relationships
Agenda for June 2, 2026 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2026\Agenda - 06-02-2026 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Qualifications & E6 perience <br /> ALAMANCE COMMUNITY COLLEGE PUBLIC 1 <br /> SAFETY TRAINING CENTER / <br /> GRAHAM, NC <br /> The new Training Center is constructed to house instructional <br /> programs,both curriculum and continuing education, for students 111 <br /> pursuing credentials and careers in public safety and public service, <br /> and in-service training for professionals already employed in these 1 <br /> occupations. The two facilities in this project will include a classroom 1 <br /> building and a firing range building. These will allow ACC to offer: <br /> Indoor Rifle &Handgun ranges, Firearms Training Simulator Space, • • , <br /> Outdoor Driving Pad, Overview Tower, Four-Story Fire Training Tower, • <br /> Class A Burn Building, Class B Burn Pit, Classroom/Lab Space, Police - <br /> Officer Physical Abilities Test(POPAT) area,Weapons Cleaning/Repair • • <br /> Room, Ammunition Storage Room. ' • <br /> PRECON. SERVICES CONST. SERVICES <br /> Precon Mgmt Proj Schedule Dev <br /> Proj Dev/Design Value Analysis (RFIs/Subst) ' 11 <br /> Value Analysis Cost Control Mgmt • <br /> Precon Schedule Trade Contractor Mgmt <br /> Constructability Review Shop Drawing Rev/Proc • • <br /> Cost Modeling Proj Control/Staffing . • • • . <br /> Contract Docs Coord On-Site Coord/Mgmt <br /> GMP Const Proj Meetings 1 • , •1 <br /> Contingency Dev Quality Control/Inspections , • • <br /> Trade Contractor Prequal Proj Safety (No Lost Time) •11 <br /> Contractor Reporting <br /> Contract Close-Out ' <br /> 1 . � <br /> air- a <br /> 1 • ' 1 <br /> • 1 <br /> _ I] <br /> _ - 1 <br /> 11' 1 <br /> 1 . , <br /> iH-S. •1 <br /> " • 1 <br /> RFQ 367-005466 /The Renovation& Construction of Sheriff's Office Facilities <br />
The URL can be used to link to this page
Your browser does not support the video tag.