Orange County NC Website
37 <br /> Orange County, NC I CONSTRUCTION MANAGER AT RISK CONTRACT I CONFIDENTIAL DRAFT <br /> 5. GMP Assumptions and Clarifications <br /> [Describe any assumptions, qualifications, design allowances, or scope inclusions/exclusions upon which the <br /> GMP is based] <br /> 6. Shared Savings <br /> Shared Savings, if any, shall be calculated and allocated 75% to the Owner and 25% to the CMAR, subject to <br /> the conditions of Article 7.3 of the Contract. <br /> Page 34 of 35 <br />