Browse
Search
Agenda 06-02-2026; 8-g - Approval of a Contract with Samet Corporation for Construction Manager-At-Risk Services for the Renovation of the John M. Link, Jr. Government Services Center and Construction of the Sheriff’s Evide
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2026
>
Agenda - 06-02-2026 Business Meeting
>
Agenda 06-02-2026; 8-g - Approval of a Contract with Samet Corporation for Construction Manager-At-Risk Services for the Renovation of the John M. Link, Jr. Government Services Center and Construction of the Sheriff’s Evide
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 5:15:22 PM
Creation date
5/28/2026 5:00:47 PM
Metadata
Fields
Template:
BOCC
Date
6/2/2026
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-g
Document Relationships
Agenda for June 2, 2026 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2026\Agenda - 06-02-2026 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
33 <br /> Orange County, NC I CONSTRUCTION MANAGER AT RISK CONTRACT I CONFIDENTIAL DRAFT <br /> EXHIBIT B - PHASE 1 DELIVERABLES SCHEDULE <br /> The following deliverables are required from the CMAR at each design milestone. All deliverables shall be <br /> submitted to the Owner and the Project Designer simultaneously. Unless otherwise noted, the Owner shall <br /> accept or reject each deliverable in writing within fifteen (15)days of receipt. <br /> Milestone Required Deliverable Due(Days Acceptance <br /> After Criteria <br /> Milestone D. <br /> Schematic Design (SD) Constructability Review Comments (written) 21 Written <br /> comments <br /> accepted by <br /> Owner <br /> Schematic Design (SD) Preliminary Cost Estimate by Trade/CSI 21 Estimate within <br /> Total <br /> Construction <br /> Budget or <br /> variance <br /> documented <br /> Schematic Design (SD) Budget Status Report—SD Milestone 21 Signed CMAR <br /> certification <br /> Schematic Design (SD) Master Project Schedule—Phase 1 Baseline 21 Approved by <br /> Owner <br /> Design Development Constructability Review Comments 21 Written <br /> (DD) comments <br /> accepted by <br /> Owner <br /> Design Development Updated Cost Estimate—DD Level 21 Within Total <br /> (DD) Construction <br /> Budget or <br /> variance plan <br /> provided <br /> Design Development Budget Status Report—DD Milestone 21 Signed CMAR <br /> (DD) certification <br /> Design Development Updated Master Schedule 15 Approved by <br /> (DD) Owner <br /> Design Development Subcontractor Pre-Qualification—Initial List 30 List approved <br /> (DD) by Owner <br /> Construction Documents Constructability Review Comments—50% CD 21 Written <br /> (CD)50% comments <br /> accepted <br /> Construction Documents Updated Cost Estimate—50% CD Level 21 Within Total <br /> (CD)50% Construction <br /> Budget or <br /> variance plan <br /> Construction Documents Subcontractor Pre-Qualification—Final List 21 Approved by <br /> (CD)50% Owner <br /> Construction Documents Phase Transition Checkpoint Certification 10 All certifications <br /> (CD) 100% confirmed in <br /> writing <br /> Page 30 of 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.