Browse
Search
Agenda - 06-17-2003-5a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 06-17-2003
>
Agenda - 06-17-2003-5a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:16:20 PM
Creation date
8/29/2008 10:47:33 AM
Metadata
Fields
Template:
BOCC
Date
6/17/2003
Document Type
Agenda
Agenda Item
5a
Document Relationships
2003 NS Manager - APS for operation of the Animal Shelter
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2003
Minutes - 20030617
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
RES-2003-043 Resolution to Extend Current Contract with the Animal Protection Society (APS) for Operation of the Animal Shelter
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U°~~tY Hea7f'~ <br />~ ~ <br />c 'O <br />w o ~ <br />0 3 <br />2 <br />ti, <br />Nulh Carding Pg61k Ngdih <br />ORANGE COUNTY <br />HEALTH DEPARTMENT <br />Rosemary L Summers, <br />MPH, DrPH <br />Health Director <br />Richard E. Whiffed Human <br />Services Center <br />300 West Tryon Street <br />Post Office Box 8181 <br />Hillsborough, NC 27278 <br />Phone: (919) 245-2411 <br />Fax: (919) 644-3007 <br />www co oranoe nC us/health <br />Animal Control Services <br />Central Administrative <br />services <br />Dental Health Services <br />ivironmental Health Services <br />Health Promotion and <br />Education Services <br />Personal Health Services <br /> U <br /> <br />304 Revere Road _ <br />~ <br />P O Box 8181 chi <br />Hillsborough, NC 27278 ~ <br />~ <br /> + <br />co <br />O <br />Phone: (919)245-2075 ~ <br />FAX: (919) 644-3308 E <br />. <br /> _ <br />Memo <br />To: Rosemary Summers, Health Director <br />From: John Sauls, Animal Control Director <br />Date: May 15, 2003 <br />Subject: Meeting at Animal Shelter to Survey HVAC Systems and Develop <br />Action Plan to Bring Air Exchange Characteristics to <br />Recommended Standards. (May 14, 2003, 1C1:45 to Noon) <br />Present at the meeting were Wilbert McAdoo, Public Works Director; Ron <br />Holdway, Environmental Health Director; Steve Kaufman, P.E., President of <br />RN&M Consulting Engineers; Laura Walters, Animal Shelter Director; Nicole <br />Carper, Shelter Manager; and John Sauls, Animal Control Director. <br />We began with a general discussion about the nature of the problem and the <br />history of the building, followed by a tour of the building to view every room <br />and all the intake and heat/ac output vents and exhaust vents and fans. <br />Wilbert McAdoo proposed the following action plan to be started as we were <br />meeting: <br />9 <br />Wilbert will get his people on the job immediately. Their <br />assignments are to check the operation of every exhaust fan unit as <br />much as possible without a schematic.l'hey are to attempt to <br />make every non- working unit operational wherever that can <br />safely be done. <br />Replace all filters as needed. <br />Check all heat and ac units for proper operation. <br />We discussed where we might find existing HVAC plans or schematics used by <br />the contractors who installed the systems. We agreed on where we might find <br />them and who would inquire at each location. The engineer understands his <br />mission is to effect a HVAC and air exchange system that will meet the <br />recommended standards (10-12 air exchanges per hour and no air exhausted <br />from one room into another) regardless of how much or how little he is able to <br />work with the existing systems. <br />After the meeting I discovered the names of all the companies involved in the <br />Animal Shelter Expansion Project completed in 1991, including the mechanical <br />contractor. I forwarded this information to Mr. McAdoo today. This should <br />facilitate the engineer's ability to understand the systems now in place, thereby <br />facilitating the whole project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.