Orange County NC Website
<br /> <br />Page 3 of 12 <br /> <br /> <br /> <br />Thank you for choosing Brady as your HVAC support partner. We are committed to working with you to ensure your <br />building serves the needs of your organization. We appreciate the opportunity to provide you with a proposal for your <br />equipment replacement as detailed in the following pages. This proposal is based on our site visit and information <br />provided by the owner for the installation of the new equipment. Any revision or request of change to scope of work by the <br />owner at a later date would be subject to price review at that time. <br /> <br />AHU Scope Of Work <br /> <br />Equipment Demolition, Installation and Specification <br />Brady will disconnect chilled water supply and return piping, power wiring, control wiring, and all <br />duct work and as needed for the complete removal and disposal of the existing WSHP Unit. <br /> <br />Brady will include all labor, accessories, tools, equipment and materials required to execute the <br />installation of a new Trane 5Ton WSHP. <br /> <br />Equipment Details below: <br /> <br />• Qty: 1 Tag(s): GEX-1 <br />Standard efficiency vertical <br />5 ton nominal size <br />208-230/60/3 <br />Insulated Copper EX/suct lines <br />Heating and cooling refrigerant circuit <br />Variable ECM - Constant Torque <br />35 deg freeze protection <br />Top supply air arrangement <br />Right return air arrangement <br />Symbio 400B <br />Condensate overflow sensor <br />Entering water sensor <br />Matte Faced Insulation <br />2" MERV 8 <br />Enhanced sound attenuation package <br />Standard piping configuration <br />Ducted Filter Rack (Side access-L/R) <br />Single Point Power <br />Polymer drain pan <br />Standard 5 year compressor warranty <br />Zone sensor with external adjust and timed override (Field Installed) <br />Startup & 1st year labor warranty whole unit <br />36ā€ hose kit with balancing valve <br /> <br />Pipe, Valves, Fittings <br />Brady will furnish and install all pipe, manual operated valves, and fittings, as needed to <br />connect the chilled water supply and return piping to the new AHU. <br /> <br />All refrigeration piping will be type ā€œLā€ hard drawn copper tubing and wrought copper fittings. All <br />piping will be cleaned, dehydrated, sealed and marked ACR. <br />Docusign Envelope ID: 6CB9BF4A-D04B-8CE0-8061-F93AFA2D6BF7