Orange County NC Website
PV PANEL ON BALLASTEDRACKING SYSTEM (TYPICAL)APPROXIMATE LOCATION OFEXISTING UTILITY TRANSFORMER(POINT OF INTERCONNECTION)EQUIPMENT ON EXTERIOR WALL(2) INVERTERSPANEL 'PV'AC DISCONNECTDC CONDUIT FROM PANELS TOINVERTER. CONDUIT SHALL NOTPENETRATE THE BUILDING ROOFAT ANY LOCATION.UNDERGROUND CONDUIT FROMAC DISCONNECT TO UTILITYTRANSFORMER.APPROXIMATE LOCATION OF 'DPH'WILDE #: 25-247THIS DRAWING IS AN INSTRUMENT OF SERVICE. THE DRAWING AND THE INFORMATION THEREON IS THE PROPERTY OF WILDE ENGINEERING, PLLC ANY REPRODUCTION, ALTERATION, OR USE FOR OTHER THAN THE INTENDED PROJECT, WITHOUT THE WRITTEN CONSENT OF WILDE ENGINEERING, PLLC IS EXPRESSLY FORBIDDEN. COPYRIGHT © WILDE ENGINEERING PLLC 2026, ALL RIGHTS RESERVED.02/16/2026REVISIONSNo.DescriptionDateSEALBID DOCUMENTSWilde EngineeringCopyright 2026-BID DOCUMENTS02/16/2026SOUTHERN HUMAN SERVICES CENTER <br />SOLAR PV PROJECT <br />2501 HOMESTEAD ROAD <br />CHAPEL HILL, NC 27516 BID DOCUMENTS ONLYNOT FOR CONSTRUCTIONSYSTEM OWNER: ORANGE COUNTY NORTH CAROLINASITE PLANE-101SITE PLAN11/8"=1'-0"GENERAL NOTES:A.CONTRACTOR SHALL MAKE BEST EFFORT AT CLEAN AND EFFECTIVE WIRE MANAGEMENT AS SHOWN ANDPER RACKING MANUFACTURER REQUIREMENTS AND RECOMMENDATIONS.B.ALL PV WIRING INSTALLED IN FREE AIR SHALL BE INSTALLED WITHIN 1FT OF THE ARRAY BOUNDARY. UTILIZEWIRE LOOM TO PROTECT WIRES OUTSIDE OF THE ARRAY BOUNDARY (INCLUDING BETWEEN THE ARRAYAND THE COMBINER).C.ALL INTER-ARRAY RACEWAYS SHALL BE IMC CONDUIT. GROUND CONDUIT ON BOTH ENDS WITH THREADEDGROUNDING BUSHINGS PER SPECIFICATIONS.Docusign Envelope ID: 44C13555-A1DE-83DE-8008-D9A38861DC35