Browse
Search
2026-201-E-AMS-8Msolar-Southern Human Services - Solar Installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2026
>
2026-201-E-AMS-8Msolar-Southern Human Services - Solar Installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 3:18:32 PM
Creation date
5/28/2026 3:14:21 PM
Metadata
Fields
Template:
Contract
Date
5/19/2026
Contract Starting Date
5/19/2026
Contract Ending Date
5/22/2026
Contract Document Type
Contract
Amount
$349,368.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Revised 01/24 <br /> <br /> <br />1 <br /> [Departmental Use Only] <br /> TITLE SHSC Solar <br /> FY 2025-2026 OC5478 <br />NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT OVER $250,000.00 <br />ORANGE COUNTY <br /> <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called “Agreement”), made as of the 8th day of <br />May, 2026, by and between 8Msolar LLC, (hereinafter called the “Contractor”), and Orange County, a <br />political subdivision of the State of North Carolina, (hereinafter called the “County,” “Orange County,” or <br />“Owner”). <br /> <br /> <br />W I T N E S S E T H: <br /> <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> <br />1. CONTRACT DOCUMENTS; PRIORITY <br /> <br /> The Contract Documents consist of this Agreement , the General Conditions which are fully <br />incorporated in this Agreement, the Request for Proposals, designer approved communications and field <br />orders, the Proposal, Construction Documents and Drawings and Written Specifications. The Contract <br />Documents form the Contract. In the event of any inconsistency between or among the Contract Documents <br />the Contract Documents shall be interpreted in the following order of priority: <br /> <br />a. This Agreement and incorporated General Conditions attached as Exhibit 1. <br /> <br />b. Designer approved and stamped construction documents and drawings and written <br />specifications. <br /> <br />c. Designer approved communications and field orders. <br /> <br />d. Request for Proposals and addenda thereto. <br /> <br />e. Proposal. <br /> <br />2. SCOPE OF WORK <br /> <br /> The Contractor shall furnish and deliver all of the materials, and perform, and be fully responsible <br />for all of the Work required by this Agreement within the time period stipulated in a written Notice -to-Proceed <br />to be executed by the Contractor and Owner and in accordance with the following enumerated documents, <br />which are made a part hereof as if fully contained herein: <br /> <br />a. Construction Drawings prepared by Pisgah Energy (Sheet Bid Documents E-002, E101, E201, <br />E301, E302, PC-1, PC-2, PC-3, PC-4, PC-5, PC-6, PC-7, PC-8, PC-9, PC-10 dated <br />02/16/2026) <br /> <br />b. Written specifications prepared by the Designer. <br /> <br />c. 8Msolar LLC proposal dated March 30, 2026 which fully describes the work to be performed, <br />Docusign Envelope ID: 44C13555-A1DE-83DE-8008-D9A38861DC35
The URL can be used to link to this page
Your browser does not support the video tag.