Browse
Search
Agenda - 06-17-2003-10a1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2003
>
Agenda - 06-17-2003
>
Agenda - 06-17-2003-10a1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:16:29 PM
Creation date
8/29/2008 10:47:31 AM
Metadata
Fields
Template:
BOCC
Date
6/17/2003
Document Type
Agenda
Agenda Item
10a1
Document Relationships
Minutes - 20030617
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />area, picnic shelters and other amenities. Several meadow areas, in keeping with the <br />Olmsteadian vision for the park, are also proposed for flexible open space uses. <br />The proposed Educational Campus on the northernmost 76 acres features a co-located <br />elementary and middle school with associated facilities. A separate pod in the campus has <br />not been designed in detail, and could feature a second elementary school or other school <br />facility, to be determined at a later date. <br />A 21-acre area that was designated as "Potential School Site" contains an archaeological site <br />of some significance, and the Master Plan proposes only a tentative trail section in this area <br />pending further research. <br />After the Board considers the Master Plan and approves the next steps of the project, staff <br />plans to submit the first phase of the project to the Town of Carrboro to begin the Town's <br />approval process. Preliminary discussions along these lines are already underway. <br />FINANCIAL IMPACT: None associated with this status report. Funding for phase I of the <br />park was included in the 2001 bond in the amount of $1.2 million. The Work Group has <br />discussed, briefly, the possibility of requesting Soccer Superfund appropriations to help build <br />additional facilities in Phase I. <br />RECOMMENDATION(S): The Manager recommends that the Board receive this report as <br />information at this time, providing any needed direction to staff about the next steps for the <br />project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.