Orange County NC Website
TUSCANY RIDGE SUBDIVISION PRELIMINARY PLAN , <br /> Issue Public Concerns County Response/Actions <br /> 1 . Location/Land Rural Character • Current zoning within the rural buffer allows 2-acre lots. <br /> Use • This density was established 14 years ago. <br /> Local residents value the rural character of the area • The development's planned density levels meet all current zoning <br /> and believe that the density of this development is requirements. <br /> too.great for a "rural" area. • The neighborhood developed lot size pattern ranges from 2 acres to <br /> 10+ acre exempt lots. The majority;of the area is underdeveloped. <br /> • As growth pressures continue to escape the urban areas, the 2-acre <br /> density and 2-acre minimum acre lot size is the probable <br /> subdivision design pattern. <br /> • Open space design options are not mandated in the rural buffer area. <br /> • The Cane Creek and University Lake watershed sections of the <br /> county now have larger lot sizes and lower densities. (first 10 acres <br /> a 2-acre density and 5-acre density thereafter) <br /> • The USGS report also infers what may be considered a sustainable <br /> minimum lot size based on water consumption/recharge, soils <br /> characteristics, and rainfall data. This is under review and will <br /> likely be part of the land use plan as land holding capacity <br /> constraints. <br /> $ " ' <br /> d <br /> W <br /> 2. Rural Buffer Public Notification • Public notification regarding development activity is not required in <br /> Issues the rural buffer. A change in notification procedures within the <br /> Most people attending the meeting were very upset buffer may require a rule change and amendment review by all <br /> that the neighborhood had not been made aware of members in the joint planning area. Notifying people where it is not <br /> the Tuscany Ridge plans before both the Planning required by the present code would be overstepping staff s present <br /> Board and the Board of County Commissioners authority and incur unbudgeted expenses. <br /> approved the preliminary plans. • The Planning Board asked staff to review public notification <br /> requirements inside of the joint planning area (JPA) and compare it <br /> with the requirements outside the JPA. <br /> • An amendment to County ordinances will follow next Public <br /> Hearing. <br /> • The Neighborhood information meeting (NM is required for <br /> major subdivisions (5+ lots) in other sections of the county. <br /> • The reason for the absence of a NIM in the rural buffer may be <br /> related to the 2-acre minimum being the largest minimum lot size at <br /> that time and therefore lot size pattern incompatibilities had been <br />