Orange County NC Website
structure located on CAPKOV ' s New Lot I Property from the relevant governmental authority . <br /> (f) Use of Access Easement. No barriers , obstructions , fences or other hindrances <br /> to the free and unrestricted two -way pedestrian and vehicular traffic shall be erected or maintained on <br /> or within the Cross-Access Easement Tract, except temporarily for reasonable times and in a <br /> reasonable manner for purposes of performing maintenance or repair. Once constructed, the Cross- <br /> Access Easement Tract shall not be used for the parking of vehicles within the Cross -Access Easement <br /> Tract by CAPKOV, its successors , assigns , occupants , invitees , licensees , contractors or other person <br /> accessing CAPKOV ' s New Lot 1 or New Lot 2 . Once constructed, the Cross -Access Easement Tract <br /> shall not be used by either Party for the staging of materials , or the storage of personal property of any <br /> kind without the written consent of the Parties . <br /> 2 . Stormwater Easements . <br /> ( a) Permanent Underground Storage Detention Facility Easement . ORANGE <br /> COUNTY declares , grants and conveys for the benefit of CAPKOV, its successors and assigns , a non- <br /> exclusive and perpetual right and easement over, upon, across and through the area labeled "Permanent <br /> Underground Stormwater Detention Easement" as shown on Exhibit B attached hereto and <br /> incorporated herein by reference (the " SDFE Tract") located on the COUNTY Property (the <br /> "Stormwater Detention-Facility Easement" or " SDFE Easement") to run stormwater drainage <br /> piping from CAPKOV ' s New Lot 1 through the SDFE Tract to the permanent underground storage <br /> detention facility (the " SDF") located on the COUNTY Property as shown on Exhibit B , for the <br /> purpose of transporting and discharging stormwater from Lot 1 over the SDFE Tract and into the SDF . <br /> CAPKOV, its successors and assigns shall have the right of full and unimpeded access over the SDFE <br /> to complete all demolition or construction as necessary to access the SDF structure and connect <br /> piping directly to the SDF . <br /> TO HAVE AND TO HOLD the permanent SDFE Easement unto CAPKOV, its successors <br /> and assigns in title forever; it being agreed that the rights and easements hereby granted are for the use <br /> of, are appurtenant to and run with title to the Properties . ORANGE COUNTY warrants that it is <br /> seized of the COUNTY Property in fee simple and has the right to convey the SDFE Easement <br /> described herein . <br /> (i) CAPKOV, its successors or assigns is solely responsible for the perpetual <br /> maintenance, repair and replacement, and the costs thereof, of any piping or other facilities it <br /> constructs related to the SDF . CAPKOV will limit the impervious surface area on CAPKOV ' s New <br /> Lot 1 to an amount not to exceed 1 . 59 acres , the design maximum impervious surface of the SDF for <br /> stormwater running from CAPKOV ' s New Lot 1 . <br /> (ii) CAPKOV will save and hold ORANGE COUNTY harmless from any <br /> liability or costs associated with the construction of improvements necessary to access the SDF and <br /> will bear full responsibility to restore any damage to the COUNTY Property and/or the SDF to the <br /> original condition of the COUNTY Property and the SDF . <br /> (iii) The cost for repair and maintenance of the permanent underground SDF <br /> shall be shared between CAPKOV and the ORANGE COUNTY, pro rata, based on the square footage <br /> 6 <br />