Browse
Search
Minutes 04-30-2026 Joint Meeting With School Boards
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2020's
>
2026
>
Minutes 04-30-2026 Joint Meeting With School Boards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2026 10:31:35 AM
Creation date
5/20/2026 10:28:46 AM
Metadata
Fields
Template:
BOCC
Date
4/30/2026
Meeting Type
Schools
Document Type
Minutes
Document Relationships
Agenda for April 30, 2026 Joint Meeting with Schools
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2026\Agenda - 04-30-2026 Joint Meeting with the School Boards
Attachments to Joint Meeting Agenda
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2026\Agenda - 04-30-2026 Joint Meeting with the School Boards
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23 <br /> Slide#43 <br /> Local Operating Fund Balance <br /> 7,00,000 <br /> 6,610,000 <br /> 6,120,002_ <br /> 6,000,000 \, - <br /> 5,456,494 �' ± <br /> 5,000,000 4 930,000 <br /> 4,340,000 <br /> 4,000,000 <br /> 420,00 <br /> 3,000A00 <br /> 2,000,000 <br /> 1`I <br /> 1,000,00a <br /> 02020 2021 2022 2023 2024 2025 <br /> 0 actual ENGAGE. CHALLENGE. INSPIRE. <br /> Rhonda Rath presented the district's last audited fund balance of $5.5 million. She cautioned <br /> that this figure looks good on the chart, but if there is an emergency or if something comes up, it won't <br /> be enough. She noted that current operating expenses run between $3.4 and $3.5 million per month <br /> and that best practice calls for three to six months of operating expenditures held in reserve. <br /> Slide#44 <br /> Capital Improvement Update <br /> • Community Engagement <br /> • Gallery Walks (April 7, 9 8t 10) <br /> • Survey: 236 Responses (March -April 8) <br /> • "Draw Your Dream School" (April 15, Gravelly Hill MS) <br /> • Site Survey in Process <br /> • Joint Meeting between Orange County Schools, <br /> City of Mebane, and Orange County <br /> • Programming-Design Guidelines Phase in Process <br /> An <br /> 11107 ENGAGE. CHALLENGE. INSPIRE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.