Orange County NC Website
TIP/WBS # Description Let/Start Date <br />Estimated <br />Completion <br />Date <br />Project Cost Latest Status Next Step <br />Comments Project Lead <br />BP7-R018 Replace Bridge #254 on SR 2104 (Mandale Road) 10/7/32 FY2034 $710,000 Not yet started Planning and Design Activities Pending Daniel Dagenhart <br />BP7-R019 Replace Bridge #103 on SR 2182 (Perry Road) 10/21/32 FY2034 $710,000 Not yet started Planning and Design Activities Pending Daniel Dagenhart <br />I-6009 <br />47962.1.1 <br />47962.2.1 <br />47962.3.1 <br />Interchange improvements at I-40/I-85 and SR 1158 (Huffman <br />Mill Road). Construct additional right turn lane on I-40 WB <br />Ramp and improve operations at SR 1308 (Garden Road) <br />intersection in Burlington <br />1/1/40 post years $1,800,000 Not yet started Planning and design activities pending. <br />(Funded for Prelim. Engineering only) <br />Nishant Shah <br />SM-6109L <br />51806 <br />Sylvan Elementary School located at 7718 Sylvan Road (SR <br />2369), Snow Camp, NC. Internal Campus improvements as <br />identified in Traffic Operations Study SCH-2022-023 to <br />provide 1550 feet of queue storage on campus. <br />TBD TBD $325,000 Planning and Design <br />Activites Underway <br />Agreement Pending Updated estimate pending. Agreement <br />pending. <br />Matthew Whitley <br />SS-6207BD <br />52043 <br />NC 49 (Maple Avenue) at SR 1157 (Whites Kennell Road) / <br />SR 2317 (Monroe Holt Road), south of Burlington. Install two- <br />phased traffic signal with 'BE PREPARED TO STOP WHEN <br />FLASHING' advance warning signs and flashers on NC 49 <br />approaches. <br />TBD TBD $150,000 Not yet started Planning and Design Activities Pending Dawn McPherson <br />HS-2407K Multiple signalized intersections. Revise traffic signals to <br />include Leading Pedestrian Interval (LPI), pedestrian heads, <br />curb ramps, and crosswalks. (Burlington) <br />4/1/27 FY2029 $5,255,000 Not yet started New Project Dawn McPherson <br />HS-2407P NC 87 between SR 1005 (Greensboro Chapel Hill Road) and <br />SR 2316 (Thompson Road), south of Graham. Install rumble <br />stripes with 6-inch long life pavement markings. <br />TBD TBD $810,000 Not yet started New Project Trung Nguyen <br />HS-2407Q I-40/I-85 ramps at SR 1226, SR 1158, NC 62, NC 49, NC 87, <br />NC 54, SR 1928, SR 1981, and NC 119. Upgrade traffic <br />signals. (Burlington Graham, Mebane) <br />TBD TBD $178,500 Not yet started New Project Dawn McPherson <br />HS-2407R US 311 between SR 2141 (Young Road) and NC 14, south of <br />Eden. Install rumble strips and 6-inch long life pavement <br />markings. <br />TBD TBD $660,000 Not yet started New Project Trung Nguyen <br />NCDOT DIVISION 7 PROJECTS IN BGMPO - UNDER DEVELOPMENT <br />Page 3 BGMPO Jan 2026