Orange County NC Website
TIP/WBS # Description Let/Start Date <br />Estimated <br />Completion <br />Date <br />Project Cost Latest Status Next Step Comments Project Lead <br />HS-2407F NC 119 between NC 54 and SR 2126 (Old Hillsborough <br />Road); and, NC 119 between SR 1996 (Stagecoach Road) <br />and Caswell County line. Install rumble strips and 6" long life <br />pavement markings. <br />3/18/27 FY2028 $15,000 Not yet started Planning and Design Activities Pending Trung Nguyen <br />U-6013 <br />47158.1.4 <br />47158.2.4 <br />47158.3.4 <br />Widen NC 119 to multi-lanes from SR 1981 (Trollingwood- <br />Hawfields Rd)/ SR 2126 (Old Hillsborough Rd) to Lowes Blvd <br />(non-system) in Mebane. <br />5/16/28 FY2031 $16,400,000 ROW Acquisition <br />Certified <br />Planning and design activities <br />underway, ROW certified and utilities <br />underway. <br />Suzana Matta <br />BP7-R016 Replace Bridge #113 on SR 1003 (Lindley Mill Road) 8/7/28 FY2030 $1,240,000 Hydraulic Drainage <br />Design Complete <br />Planning and design activities <br />underway - Plans at 65% <br />Daniel Dagenhart <br />U-6131 Install dual left turn lanes in westbound direction at NC 54 (W. <br />Harden Street) at NC 49 (Maple Ave.) in Burlington <br />8/17/28 FY2030 $8,800,000 Not yet starrted Planning and Design Activities Pending Nishant Shah <br />AV-5851 Construct 100' paved overrun and make safety enhancements <br />at the Burlington-Alamance Regional Airport <br />1/26/29 FY31 $2,080,000 Not yet starrted Planning and Design Activities Pending Caleb Whitby <br />B-6052 <br />48709.1.1 <br />48709.2.1 <br />48709.3.1 <br />Replace bridge 68 over NCRR / Norfolk Southern Railroad on <br />SR 1928 (Trollingwood Road) in Haw River <br />3/20/29 FY2030 $3,000,000 Planning and Design <br />Activites Underway <br />PE funding approved 5/6/19. Sami Jasim <br />15BPR.134.3 Rehab on Structure #197 in Guilford County on SR 1117 (S. <br />Holden Street) over I-85 Business and on Structure #148 on I- <br />40 over Haw River in Alamance County <br />4/17/29 FY2032 $6,900,000 Planning and Design <br />Activites Underway <br />Tim Sherrill <br />U-6009 <br />47144.1.1 <br />47144.2.1 <br />47144.3.1 <br />Widen and construct center turn lane on US70 (West Church <br />St) from Tarleton Ave. to Fifth Street in Burlington <br />1/15/30 FY2032 $52,000,000 Planning and Design <br />Activites Underway <br />Suzana Matta <br />U-6114 Install traffic signal and add turn lanes at NC 62 (Alamance <br />Road) at SR 1155 (Hatchery Road)/Bonnie Lane intersection <br />in Burlington <br />6/17/31 FY2032 $2,210,000 Not yet started Planning and Design Activities Pending Nishant Shah <br />BP7-R023 Replace Bridge #238 on SR 2128 (Old Hillsborough Road) 9/18/31 FY2033 $720,000 Not yet started Planning and Design Activities Pending Daniel Dagenhart <br />EB-5879 Construct sidewalk on US 70 (N. Church St.) from SR 1716 <br />(Graham Hopedale Road) to SR 1719 (Sellars Mill Road) <br />10/1/31 FY2033 $5,180,000 Project Scoping / On- <br />boarding / Agreements. <br />Project is receiving toll <br />credits. <br />Agreement Pending Municipal Agreement required to begin <br />work <br />City of Burlington/Alex <br />Stankovic <br />EB-5988 Construct sidewalk on Lee Ave./W. Lebanon Ave. to SR 1454 <br />(W. Haggard Ave.) in Elon <br />12/4/31 FY2033 $630,000 Project Scoping / On- <br />boarding / Agreements. <br />No updates from Town. <br />Agreement Pending Municipal Agreement required to begin <br />work <br />Town of Elon/Alex <br />Stankovic <br />NCDOT DIVISION 7 PROJECTS IN BGMPO - UNDER DEVELOPMENT <br />Page 2 BGMPO Jan 2026