Orange County NC Website
TIP/WBS # Description Let/Start Date <br />Estimated <br />Completion <br />Date <br />Project Cost Latest Status Next Step <br />Comments Project Lead <br />EB-5885 Construct sidewalk on US 70 (N. Church St.) from Beaumont <br />Avenue to SR 1716 (Graham Hopedale Road) <br />10/14/26 FY 2028 $1,470,000 Final Plans approved. Change request for additional <br />funding from toll credit pilot <br />program. <br />Municipal Agreement executed. Plan <br />review underway <br />City of Burlington/Alex <br />Stankovic <br />48916 Shift NC 61 and NC 100 intersection in Gibsonville to improve <br />turning radii for trucks <br />TBD TBD $650,000 Right of Way <br />Acquisitions <br />ROW Acquisition Certification Planning and design activities <br />underway - ROW underway <br />Trung Nguyen <br />BR-0060 Replace Bridge #14 on NC 14 over Cane Creek 2/17/26 FY2028 $11,050,000 Right of Way <br />Acquisitions <br />ROW Acquisition Certification Planning and design activities <br />underway. ROW Certified 4/4/25. <br />David Stutts <br />SM-6107J <br />51622 <br />East Lawn Elementery School. Internal campus improvements <br />as identified in Traffic Operations Study SCH-2021-023 to <br />contain school-related traffic queues on campus with 2460 <br />feet of double-stacked queue. U-6014 (2025 let) will improve <br />SR 1716 and provide bike-pedestrian accommodations. This <br />6/1/26 Summer 2026 $375,000 Project Scoping / On- <br />boarding / Agreements <br />Agreement Finalized Planning and design activities to begin <br />soon. Agreement is complete. Working <br />on setting up funding. <br />Derek Dixon <br />SS-6207AA <br />51338 <br />NC 62 at SR 1002 (Jeffries Cross Road), north of Green <br />Level. Convert intersection to all way stop control. <br />7/1/26 1/1/27 $25,000 Planning and Design <br />Activites Underway <br />Dawn McPherson <br />SS-6207AH <br />51471 <br />SR 2424 (S. Maple Street) at W. Gilbreath Street in Mebane. <br />Convert intersection to all way stop operation. <br />7/1/26 TBD $25,000 Project on Hold Planning and design activities on hold. <br />Project currently on hold. Town is not in <br />favor of an all way stop. <br />Dawn McPherson <br />SS-6207AJ <br />51429 <br />SR 1581 (Stony Creek Church Road) at SR 1587 (Pagetown <br />Road), north of Burlington. Convert intersection to all way stop <br />control. <br />7/1/26 1/1/27 $25,000 Planning and Design <br />Activites Underway <br />Dawn McPherson <br />SS-6207AP <br />51642 <br />SR 1754 (McCray Road) at SR 1729 (Fleming Graham Road/ <br />Deep Creek Church Road) near Burlington. Convert two-way <br />stop to all-way stop. <br />7/1/26 1/1/27 $35,000 Planning and Design <br />Activites Underway <br />Dawn McPherson <br />U-6014 <br />47159.1.1 <br />47159.2.1 <br />47159.3.1 <br />Widen SR 1716 (Graham-Hopedale Rd) to multi-lanes with <br />Bicycle/Pedestrian accommodations from SR 1720 (West <br />Hanover Rd) to Morningside Drive in Burlington <br />2/16/27 FY2029 $21,800,000 Utility Relocations Planning and design activities <br />underway, Includes EB-5882. ROW <br />Acquisition Complete. Utility <br />Relocations underway. <br />Suzana Matta <br />HS-2407J 20 signalized intersections. Upgrade traffic signals and <br />intersections with pedestrian accommodations. <br />3/18/27 9/1/28 $40,000 Not yet started Planning and Design Activities Pending Dawn McPherson <br />50547 NC 49 at Green Level Church Road/James Boswell Road - <br />Realign Intersection <br />TBD TBD $650,000 Hydraulics Drainage <br />Design <br />Planning and design activities <br />underway. 65% plans complete. CFI <br />meeting held. Additoinal Funding <br />Needed. <br />Trung Nguyen <br />U-5844 <br />50234.1.1 <br />50234.2.1 <br />50234.3.1 <br />Construct multi-lanes on NC62 from SR 1430 (Ramada Road) <br />to US 70 (South Church Street) in Burlington <br />3/16/27 FY2030 $36,900,000 Right of Way <br />Acquisitions <br />Planning and design activities <br />underway - Field Inspection held. ROW <br />acquisitions 95% complete. 1 parcel <br />remaining. <br />Brandon Green <br />HS-2407E SR 1005 (Greensboro-Chapel Hill Road) between Guilford <br />County line and Orange County line, south of Burlington. <br />Install rumble strips and 6" long life pavement markings. <br />3/18/27 FY2028 $15,000 Not yet started Planning and Design Activities Pending Trung Nguyen <br />NCDOT DIVISION 7 PROJECTS IN BGMPO - UNDER DEVELOPMENT <br />Page 1 BGMPO Jan 2026