Orange County NC Website
TIP/WBS # Description Let/Start Date <br />Estimated <br />Completion <br />Date <br />Project Cost Latest Status Next Step <br />Comments Project Lead <br />SS-6207BB <br />52041 <br />NC 49 at SR 1004 (Corbett Ridge Road/Carr Store Road) <br />near Hillsborough. Convert intersection to all way stop <br />operation with new overhead flasher. <br />7/1/2026 1/1/2027 $40,000 Planning and Design <br />Work underway <br />Dawn McPherson <br />SS-6207AU <br />51733 <br />SR 1006 (Orange Grove Road) at SR 1115 (Arthur Minnus <br />Road/Bradshaw Quarry Road) southwest of Hillsborough. <br />Convert intersection to all way stop traffic control. <br />7/1/2026 1/1/2027 $30,000 Planning and Design <br />Work underway <br />Dawn McPherson <br />SS-6207AM Curve warning sign improvements as recommended by HNTB <br />through systemic curve signing investigations. (Alamance, <br />Guilford, Orange) <br />7/1/2026 1/1/2027 $225,000 Planning and Design <br />Work underway <br />Working on acquiring materials.Dawn McPherson <br />BR-0092 Replace Bridge #37 on NC 86 over New Hope Creek 8/18/2026 FY2029 $6,400,000 Planning and Design <br />Work underway <br />Alexander Foster <br />I-5958 <br />45910.1.1 <br />45910.3.1 <br />Pavement Rehabilitation on I-40/I-85 from West of SR 1114 <br />(Buckhorn Road) to West of SR 1006 (Orange Grove Road) <br />11/17/2026 FY2028 $9,500,000 Planning and Design <br />Work underway <br />Trung Nguyen <br />I-3306AC I-40 at NC 86 - Upgrade to superstreet from Northwood Drive <br />to Ramp C/D at I-40 interchange <br />1/19/2027 FY2029 $10,970,000 Project is currently in <br />ROW for Acquisitions. <br />Radha Attaluri <br />HS-2407H 53 signalized intersections. Upgrade traffic signals and <br />intersections with pedestrian accommodations. (Chapel Hill) <br />Signal Programming changes only. No construction. <br />3/18/2027 9/18/2028 $350,000 Planning and Design <br />Work to begin soon <br /> Project will be let for bidding. Signal <br />Programming changes only. No <br />construction. <br />Dawn McPherson <br />C-5650 Construct sidewalk on one side of SR 1919 (Smith Level <br />Road/S. Greensboro St.) from Public Works Drive to the <br />northern end of Old Pittsboro Road in Carrboro <br />4/8/2027 FY2029 $2,749,000 Carrboro approved to <br />incorporate water line <br />work into design. Env <br />doc returned w <br />comments on 12/10/21. <br /> Document to be updated to <br />include additional limits for <br />resurfacing. <br /> NCDOT waiting on revised plans to be <br />submitted for review. <br />Alex Stankovic <br />BP7-R013 Replace Bridge #90 on SR 1940 (Damascus Church Road) 4/23/2027 FY2030 $2,220,000 Planning and Design <br />Work underway <br />Plans at 25% Daniel Dagenhart <br />HS-2407S NC 49. Alamance County: Between NC 62 and Orange <br />County line (MP 27.938-31.985); Orange County: Between <br />Alamance County line and NC 86 (MP 0-5.206), northeast of <br />Burlington. Install rumble strips and 6-inch long life pavement <br />markings. Alamance (44%), Orange (56%) <br />6/1/2027 6/1/2028 $700,000 New Project New Project Dawn McPherson <br />P-5701B <br />46395.1.1 <br />46395.3.3 <br />Construct Platform, Passenger Rail Station Building at <br />Milepost 41.7 Norfolk Southern H-line in Hillsborough <br />6/30/2027 FY2028 $7,200,000 Planning and Design <br />Work underway <br />Matthew Simmons <br />HS-2407 G 22 signalized intersections. Upgrade traffic signals and <br />intersections with pedestrian accommodations. (Chapel Hill, <br />Carrboro) <br />9/16/2027 3/16/2029 $1,610,000 Planning and Design <br />Work to begin soon <br /> This project entails actual construciton <br />not just re-programming. <br />Dawn McPherson <br />B-6037 Replace Bridge #49 over Norfolk Southern Railway on NC 86 6/20/2028 FY2032 $14,080,000 Planning and Design <br />Work underway <br />25% Plans complete. Nishant Shah <br />NCDOT DIVISION 7 PROJECTS IN TWTPO - UNDER DEVELOPMENT <br />Page 2 TWTPO Jan 2026