Orange County NC Website
TIP/WBS # Description Let/Start Date <br />Estimated <br />Completion <br />Date <br />Project Cost Latest Status Next Step Comments Project Lead <br />EB-5721 Upgrade existing off-road path and construct new section of <br />path of Bicycle Route #1 from Cleland Drive to Willow Drive in <br />Chapel Hill <br />TBD FY2027 $2,700,000 Bids rejected project on <br />hold. <br />Needs additional design work <br />due to tropical storm damage. <br />Chapel Hill has secured additional <br />funding to relet at a future date. <br />Alex Stankovic <br />EL-4828A Construct Morgan Creek Greenway Phase 1 in Carrboro 12/15/2025 FY2028 $1,568,000 Final Plans RCVD CE under review. Final plans <br />pending approval. <br /> Fed End Date Sept 26th and won't be <br />extended! Town responsible for <br />charges after end date. <br />Alex Stankovic <br />HL-0045 Repair Bridge #241 on Exchange Park Lane over Eno River <br />from South Churton Street to Faribult Lane in Hillsborough <br />3/19/2026 FY2028 $153,800 Review of final plans <br />complete. <br />Hillsborough to prepare <br />environmental documents and <br />plans. <br /> CE submitted. Agreement executed <br />and Funding secured from Town. <br />Alex Stankovic <br />C-5181 Jones Creek Greenway Project - Fill Gap between the <br />Carrboro Upper Bolin Trail and Twin Creeks Greenway and <br />also implement program to support on-vehicle trips to Morris <br />Grove Elementary School <br />3/26/2026 FY2027 $910,000 NCDOT approved final <br />plans <br />Awaiting letting. Environmental document approved <br />8/14/23. <br />Alex Stankovic <br />SS-6207BA <br />52040 <br />I-40EB/I-85 NB Ramps at SR 1226; I-40WB/I-85SB Ramps at <br />SR 1226; I-40EB/I-85 NB Ramps at SR 1158; I-40WB/I-85SB <br />Ramps at SR 1158; I-40EB/I-85 NB Ramps at NC 62; I- <br />40WB/I-85SB Ramps at NC 62; I-40EB/I-85 NB Ramps at NC <br />49; I-40WB/I-85SB Ramps at NC 49; I-40EB/I-85 NB Ramps <br />at NC 87; I-40WB/I-85SB Ramps at NC 87; I-40EB/I-85 NB <br />Ramps at NC 54; I-40WB/I-85SB Ramps at NC 54; I-40EB/I- <br />85 NB Ramps at SR 1928; I-40WB/I-85SB Ramps at SR <br />1928; I-40EB/I-85 NB Ramps at SR 1981; I-40WB/I-85SB <br />Ramps at SR 1981; I-40EB/I-85NB Ramps at NC 119; I- <br />40WB/I-85SB Ramps at NC 119; I-40EB/I-85NB Ramps at <br />SR 1007; I-40WB/I-85SB Ramps at SR 1007;I-40EB/I-85NB <br />4/1/2026 4/1/2027 $400,000 Planning and Design <br />Work underway <br />Multiple signing and pavement marking <br />upgrades recommended by the Wrong <br />Way Driver Road Safety Review. See <br />spreadsheet included in the project <br />submittal package describing the <br />signing and pavement marking <br />improvements to be included in the <br />project. State funds requested since it <br />is expected that implementation will be <br />done by state forces. <br />Dawn McPherson <br />HS-2007H <br />49317.1.9 <br />49317.2.9 <br />49317.2.10 <br />49317.3.9 <br />SR 1009 (Old NC 86) at SR 1727 (Eubanks Road) near <br />Chapel Hill. Right Turn Lane Modifications. <br />4/2/2026 FY2028 $153,000 Planning and deisgn <br />activities on hold. <br />Finalizing ROW plans on <br />hold. <br />Project on Hold due to funding Trung Nguyen <br />BP7-R009 Replace Bridge #11 on SR 1336 (Halls Mill Road)4/16/2026 FY2029 $2,900,000 ROW acquisisition <br />complete. <br />Working on Final Plans Daniel Dagenhart <br />HO-0013 <br />51177.1.1 <br />51177.2.1 <br />51177.2.2 <br />51177.3.1 <br />Chapel Hill from Franklin Street and Rosemary Street, and the <br />streets in between from Merritt Mill Road to Henderson Street <br />in downtown Chapel Hill. Install new mast arm and curb and <br />sidewalk improvements. <br />5/12/2026 FY28 $2,100,000 Municiapal Agreement <br />Executed. <br />Project approved by BOT and <br />assigned. Possible 3rd intersection to <br />be added to project. <br />Alex Stankovic <br />SS-6207AY <br />51799 <br />SR 1341 (Harmony Church Road) at SR 1343 (Mill Creek <br />Road), northeast of Mebane. Convert intersection to all way <br />stop operation without flashers. <br />7/1/2026 1/1/2027 $40,000 Planning and Design <br />Work underway <br />Dawn McPherson <br />SS-6207AX <br />51780 <br />NC 157 (Guess Road) at SR 1538 (New Sharon Church <br />Road), northeast of Hillsborough. Convert intersection to all <br />way stop operation without flashers. <br />7/1/2026 1/1/2027 $35,000 Planning and Design <br />Work underway <br />Dawn McPherson <br />SS-6207BC <br />52042 <br />SR 1177 (Dairyland Road) at SR 1102 (Dodsons Crossroads), <br />west of Chapel Hill. Install all way stop traffic control. <br />7/1/2026 1/1/2027 $30,000 Planning and Design <br />Work underway <br />Dawn McPherson <br />SS-6207AZ <br />51999 <br />SR 1004 (Efland-Cedar Grove Road / Carr Store Road) at SR <br />1357 (Efland-Cedar Grove Road) / SR 1352 (Carr Store <br />Road), north of Hillsborough. Convert intersection to all way <br />stop operation. <br />7/1/2026 1/1/2027 $40,000 Planning and Design <br />Work underway <br /> Change existing overhead flasher 07- <br />0072 to all red displays. <br />Dawn McPherson <br />NCDOT DIVISION 7 PROJECTS IN TWTPO - UNDER DEVELOPMENT <br />Page 1 TWTPO Jan 2026