Orange County NC Website
TIP# / CONTRACT# Description Start DateEstimated Completion DateConstruction CostLatest CON Status Contractor CommentsResident Engineer / Project ContactSS-6207T 51112Portions of Twenty-One (21) Routes. Curve Warning Sign Installation.9/20/233/30/2026$200,000 80% ON-Call Dawn McPhersonSS-6207BA 52040I-40EB/I-85 NB Ramps at SR 1226; I-40WB/I-85SB Ramps at SR 1226; I-40EB/I-85 NB Ramps at SR 1158; I-40WB/I-85SB Ramps at SR 1158; I-40EB/I-85 NB Ramps at NC 62; I-40WB/I-85SB Ramps at NC 62; I-40EB/I-85 NB Ramps at NC 49; I-40WB/I-85SB Ramps at NC 49; I-40EB/I-85 NB Ramps1/2/2026 10/1/2026 $400,000 ON-Call New to Construction Dawn McPhersonC204632WIDENING I-40 FROM I-85 IN ORANGE COUNTY TO THE DURHAM COUNTY LINE AND I-40 WESTBOUND IN DURHAM COUNTY NEAR US-15/501.10/28/21 6/17/26 $236,457,869 71%THE LANE CONSTRUCTION CORPORATIONCrews, PE, Jacob TC2049731 SECTION EACH OF NC-86, NC-751, NC-54/US 15-501 NORTH AND SOUTH, AND 2 SECTIONS OF SECONDARY ROADS5/4/26 TBD $4,888,116SUNROCK INDUSTRIES LLC DBA CAROLINA SUNROCK LLCNew to ConstructionHowell, Bobby JC20512757 SECTIONS OF SECONDARY ROADSTBD TBD $5,511,362FSC II LLC DBA FRED SMITH COMPANYNew to ConstructionHowell, Bobby JDG00639FIFTEEN SECONDARY ROADS IN ORANGE COUNTY6/30/25 3/11/26 $1,616,171 85%SUNROCK INDUSTRIES LLC DBA CAROLINA SUNROCK LLCHowell, Bobby JDG00660 BO-2407AVARIOUS LOCATIONS IN DIVISION 7 WITH POPULATIONS UNDER 5K8/18/25 4/30/26 $222,636 77%LITTLE MOUNTAIN BUILDERS OF CATAWBA COUNTY LLCHowell, Bobby JDG00595FIFTY ONE SECONDARY ROADS3/17/25 11/6/25 $2,494,635 100%RILEY PAVING INC Howell, Bobby JDG00626TWENTY THREE SECONDARY ROADS IN ORANGE COUNTY674/3/25 12/12/25 $2,190,854 100%SUNROCK INDUSTRIES LLC DBA CAROLINA SUNROCK LLCHowell, Bobby JDG00640TWENTY EIGHT SECONDARY ROADS6/30/25 12/30/25 $1,393,782 100%CAROLINA SUNROCK SOLUTIONS LLCHowell, Bobby JDG00652ADD MID-BLOCK PEDESTRIAN CROSSING ON NC 86 AND CRITZ DRIVE IN CHAPEL HILL7/16/25 10/21/25 $437,772 100%ATLANTIC CONTRACTING COMPANY INCHowell, Bobby JNCDOT DIVISION 7 PROJECTS IN CPRPO - UNDER CONSTRUCTIONPage 3CPRPO Jan 2026