Browse
Search
OUTboard Meeting May 18, 2026
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2026
>
OUTboard Meeting May 18, 2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2026 7:34:14 PM
Creation date
5/19/2026 7:34:07 PM
Metadata
Fields
Template:
BOCC
Date
5/18/2026
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIP# / <br />CONTRACT# Description Start Date <br />Estimated <br />Completion <br />Date <br />Construction <br />Cost Latest CON Status Contractor Comments Resident Engineer / <br />Project Contact <br />SS-6207AG <br />51428 <br />NC 87 at SR 2172 (Moores Chapel Cemetery Road) near <br />Graham. Convert intersection from two way stop to all-way <br />stop with overhead flasher. <br />5/28/24 3/1/26 $49,000 Construction underway. On Call Dawn McPherson <br />SS-6207AE <br />51426 <br />SR 1003 (Lindley Mill Road) at SR 2172 (Moores Chapel <br />Cemetery Road) near Graham. Convert intersection from two <br />way stop to all-way stop with overhead flasher. <br />5/28/24 3/1/26 $52,000 Construction underway. On Call Dawn McPherson <br />C204572 <br />U-6010 <br />INTERSECTION IMPROVEMENTS ON US 70 (SOUTH <br />CHURCH STREET) AT SR 1226/SR 1311 (UNIVERSITY <br />DRIVE) IN BURLINGTON <br />9/29/2022 1/24/2026 $13,975,135.25 Construction underway. APAC ATLANTIC INC. <br />THOMPSON ARTHUR <br />DIVISION <br />Howell, Bobby J <br />C204998 1 SECTION OF NC-49/NC-54/NC-87 AND 3 SECONDARY <br />SECTIONS OF SECONDARY ROADS. <br />8/10/2025 8/1/2026 $5,762,575.00 Construction underway. FSC II LLC DBA FRED <br />SMITH COMPANY <br />Howell, Bobby J <br />C205003 15 SECTIONS OF SECONDARY ROADS. 7/8/2025 7/17/2026 $4,441,807.39 Construction underway. APAC ATLANTIC INC. <br />THOMPSON ARTHUR <br />DIVISION <br />Howell, Bobby J <br />C205066 <br />U-6011 <br />US-70 (SOUTH CHURCH ST) AT SR-1158 (HUFFMAN MILL <br />RD) <br />6/16/2025 3/21/2027 $6,097,609.00 Construction underway. FSC II LLC DBA FRED <br />SMITH COMPANY <br />Howell, Bobby J <br />C205080 <br />I-6059 <br />INTERCHANGE OF I-40/I-85 AND SR-1981 <br />(TROLLINGWOOD-HAWFIELDS RD) IN MEBANE <br />4/24/2025 5/1/2028 $376,087.37 Construction underway. APAC ATLANTIC INC SMITH <br />ROWE LLC JV <br />Howell, Bobby J <br />C205115 41 SECTIONS OF SECONDARY ROADS 5/4/2026 $5,495,482.37 Construction underway. TRUEROCK <br />CONSTRUCTION LLC <br />Howell, Bobby J <br />DG00613 <br />U-6017 <br />INTERSECTION IMPROVEMENTS AT NC 54 (EAST <br />HARDEN ST) & NC 49 (EAST ELM ST) IN GRAHAM <br />5/22/2024 2/9/2026 $4,750,539.93 Construction underway. TRIANGLE GRADING & <br />PAVING INC <br />Howell, Bobby J <br />DG00646 THIRTY-FOUR SECONDARY ROADS $1,377,215.56 Construction underway. WHITEHURST PAVING CO <br />INC <br />Howell, Bobby J <br />DG00655 <br />U-3109A(L) / <br />U-3109B(L) <br />I-40/I-85 AT NC 119 GRAHAM 12/6/2024 7/31/2028 $303,245.42 Construction underway. NATURAL CHOICE <br />CONTRACTING LLC <br />Howell, Bobby J <br />DG00595 FIFTY ONE SECONDARY ROADS 3/17/2025 11/6/2025 $2,494,634.93 Construction <br />COMPLETE. <br />RILEY PAVING INC Howell, Bobby J <br />DG00631 <br />R-5787FA <br />INTERSECTIONS OF VARIOUS US, NC AND SR ROUTES 5/21/2024 10/24/2025 $919,609.00 Construction <br />COMPLETE. <br />EASTERN EARTHSCAPES & <br />CONSTRUCTION LLC <br />Howell, Bobby J <br />NCDOT DIVISION 7 PROJECTS IN BGMPO - UNDER CONSTRUCTION <br />Page 4 BGMPO Jan 2026
The URL can be used to link to this page
Your browser does not support the video tag.