Orange County NC Website
9 <br /> FY2026-36 Recommended Capital Investment Plan <br /> Mission Support <br /> • Fuel Station — Pump, Tanks &Tank <br /> Monitoring Replacement - $297,200 (p.71) <br /> r <br /> — Replacement of underground fuel storage tanks <br /> at the end of life with above-ground fuel storage <br /> with barriers <br /> T 51 <br /> ORANGE COUNTY <br /> tt <br /> NOR"I H CAROLINA <br /> 1 <br /> 2 Travis Myren explained the proposal to replace underground fuel tanks at the motor pool with <br /> 3 aboveground tanks. He said it is the environmentally right thing to do, as it eliminates the risk of <br /> 4 undetected soil contamination. He said barriers would also be constructed around the new aboveground <br /> 5 tanks, and spill detection equipment would be replaced. <br /> 6 Commissioner Bedford asked whether testing for soil contamination would be required. <br /> 7 Travis Myren indicated the underground tanks would be left in place but filled with an inert <br /> 8 material rather than removed. <br /> 9 <br /> 10 Slide#12 <br /> FY2026-36 Recommended Capital Investment Plan <br /> Environmental Protection and Climate Action <br /> ,.inity Goats <br /> • Historic Courthouse Square - $371,243 <br /> (p.74) <br /> I <br /> .V <br /> — Historic Courthouse design <br /> • Exterior restoration and structural repairs <br /> Interior upgrades to elevator,electrical system,HVAC <br /> system,fire alarm,audiolvisual devices and lighting <br /> — Construction costs in Year 2-$4.5 million _ <br /> ORANGE COUNTY <br /> 12 NOR-rH CAROMNA <br /> 11 <br />