Browse
Search
Minutes - 19660621
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
1960's
>
1966
>
Minutes - 19660621
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2008 11:52:32 AM
Creation date
8/13/2008 12:03:07 PM
Metadata
Fields
Template:
BOCC
Date
6/21/1966
Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />53 <br /> <br /> The following representatives of the State Highway Commission were. present: <br /> T. A. Burton, Division Engineer, Earl Hoover, District Engineer, J. B. Taylor from <br /> the District Office and C. I. Walters, Seventh District Supervisor. <br /> The purpose of this meeting was to receive from the representatives of the <br /> State Highway Commission the proposed 1966-67 Secondary Road Program for Orange <br /> County and to also receive Part "A" Bond Program plans scheduled for orange County <br /> during the 1966-67 calendar year. <br /> The following road programs were presented: <br /> 1966-1967 SECONDARY ROAD PROGRAM - ORANGE COUNTY <br /> 1966-1967 Allocation $208,220.00 <br /> Less 10% Reserve 20,822.00 <br /> Balance 1966-1967 187,398.00 <br /> Delete $37,000 from WO 6.502104 - Log Cabin SS) 37,000.00 <br /> Balance for Programming $224,398.00 <br /> Paving Program <br /> W.O. 6.502098 Suppl. to Connection - Carrboro to NC 86 $ 20,000.00 <br /> Map <br /> No. SR Length Description Est. Cost <br /> 1 1102 1.6 Dodson's Cross Rd. - From SR 1177 to SR 1115 45,000.00 <br /> 2 1551 2.6 Edmund Walker Rd. - From NC 86 to NC 57 48,000.00 <br /> 3 1939 0.5 Damascus Church Rd. - from SR 1940 to 15,398.00 <br /> Chatham CL <br /> 4.7 Mi. Total $'108,398.00 <br />Stabilization <br />4 1546 1.9 Vance Roberts Road - From SR 1506 to SR 1507 $ 20,000.00 <br />5 1339 <br /> 1341 3.2 Hanner Road - From SR 1343 to SR 1004 35,000.00 <br />6 1125 2.1 Tapp Road - From SR 1114 to SR 1126 21,000.00 <br />7 1958 2.00 Lloyd Road - From SR 1956 to SR 1960 20.000.00 <br /> 9.2 Mi.. Totals $ 96,000.00 <br /> Total as Programmed $ 224,398.00 <br /> PART "A" BOND PROGRAM - ORANGE COUNTY <br /> Total Allocation $971,100 <br /> Part "A" Portion as Programmed Below 504,700 <br /> Balance for Future Programming $466,400 <br /> Paving Program <br />Map <br />No. SR Len th Description Est. Cost <br />1 1555 0.8 Miller Road - from US 70 to Orange H.S. Road S 14,200 <br />2 1716 0.3 Crabtree Road - from SR 1720 to SR 1778 7,500 <br />3 1111 2.1 Old Greensboro Road - from SR 1104 to SR 1112 60,000 <br /> 1179 <br />4 1712 1.3 Kirkland Road - from SR 1710 to SR 1720 40,000 <br />5 1350 1.5 Tate Road - from SR 1341 to SR 1364 35,000 <br />6 1310 1.6 John Miller Road - from US 70 to SR 1306 45,000 <br />7 1102 1.2 Dodson Cross Rds. - from US 1006 to SR 1115 32,000 <br />8 1129 1.6 Davis Road - from SR 1009 to point 1.6 mi. SW 45,000 <br />9 1524 2.5 Charles Nichols Rd.. - from NC 157 to NC 57 50,000 <br />10 1345 1.9 Tom Ward Road - from SR 1306 to SR 1340 48,000 <br /> 1343 <br />11 1365 1.0 Mt. Zion Church Rd. - from SR 1364 to Alamance 28,000 <br /> CL <br />11-A 1144 1.75 Old NC 10 - from SR 1145 to end bit. pav't 39,000 <br />17.55 Mi. Total $443,700 <br />Stabilization <br />2 1713 0.7 Old Mt. Herman Church Rd. - from Old US 70 $ 7,000 <br />to SR 1710 <br />3 1332 3.0 Old Hillsboro-Cedar Grove Rd. - from SR 1004 40,000 <br />to SR 1334 <br />4 1528 1.4 Dick Holman Road - from NC 57 to SR 1526 14,000 <br />5.10 Mi. Total $ 61,000 <br />22.65 Mi. Grand-Total $504,700
The URL can be used to link to this page
Your browser does not support the video tag.