Orange County NC Website
17 Draft <br /> 1 <br /> 2 Nathan Robinson: Ff you did 1,600, and if we added, so that would be 1,600—and I'm, I'm sorry. I'm supposed to make <br /> 3 a decision not to help you. <br /> 4 <br /> 5 Leann Brown: No, no, I think you have caught something that's very important. And I really appreciate the attention <br /> 6 to detail you gave it.And I heard you ask the question, and I thought,well, I think he's right. I think we <br /> 7 need to not short that in any way and come back and realize over a 5-year period, we wish that had <br /> 8 been a little bigger than it was. <br /> 9 <br /> 10 Nathan Robinson: Right now we're well, right now we're tilting towards saying yes to whatever you ask for. So, if you <br /> 11 ask for something, make sure you don't have to ask again. <br /> 12 <br /> 13 Leann Brown: Let me consult with my team because I'm tilting toward that number not requiring us to come back <br /> 14 and go, "I'd like to modify the special-use permit to make this bigger," so hold on one second. <br /> 15 <br /> 16 Cy Stober: And, Mr. Chair, if I may, while we have some time, just a reminder on what minor modifications the <br /> 17 planning director can approve, per the UDO. With regard to the placement and the change from the <br /> 18 site-specific plan, in this case, we have an actual number of square footage of structural footprints. <br /> 19 It's 5 percent change, and I think it's 100 feet, no more than 100 feet in location. That may actually be <br /> 20 too much. I can confirm that. But it is 5 percent change in the footprint of anything, so that's not much, <br /> 21 particularly to your point, Mr. Robinson, about 12 by 12 or 20 by 20. <br /> 22 <br /> 23 Leon Meyers: 2,264 square feet in this case. <br /> 24 <br /> 25 Cy Stober: Correct. <br /> 26 <br /> 27 Leon Meyers: So that's the flexibility that the staff would have to approve as a minor modification before a full change <br /> 28 to the SUP would be required. <br /> 29 <br /> 30 Beth Bronson: I would want to think about putting a condition that increases the discretion of the planning director <br /> 31 and staff. <br /> 32 <br /> 33 Nathan Robinson: Can we do that? <br /> 34 <br /> 35 Leon Meyers: You're going to get in trouble with James. <br /> 36 <br /> 37 Cy Stober: Our planning and zoning and manager has corrected me. That's just a 5 percent change in open <br /> 38 space not structural space. Thank you, Taylor. <br /> 39 <br /> 40 Leon Meyers: Okay. <br /> 41 <br /> 42 Taylor Perschau: Or recreation facilities or landscaping. <br /> 43 <br /> 44 Cy Stober: Or recreational facilities. So, for example, there's a couple structures, the pavilion— <br /> 45 <br /> 46 Beth Bronson: Outdoor auditorium. <br /> 47 <br /> 48 Cy Stober: —yes, the outdoor auditorium, those would all be subject to discretion as a matter of modification. It <br /> 49 is 100 feet of placement, so we can deviate from the site-specific plan by 100 feet, within reason, <br /> 50 provided no conflicts arise from that relocation of a structure, if it's a recreational facility. <br /> 17 <br />