Orange County NC Website
- On-site provider briefings <br />- On-site outreach coordination to prepare by-name list of regular sleepers <br />- Onsite closure maintenance planning meeting and preparation of closure plan <br />- Onsite field work with teams to test workflows <br />- Activate regular briefings and tracking tools <br />- On-demand technical assistance to project leads and field staff <br />- Prepare general policies and procedures based on first test site <br />- Prepare plan for site or zone selection/order <br /> <br />The first test site is typically 4-6 weeks in total duration with Clutch onsite 3 weeks to <br />support team in preparing BNL, site management, and closure maintenance process. This <br />test typically occurs during the initial prep period if existing funds and capacity can be <br />marshalled for such activities. If not, the test will kick-off the initiative at the conclusion of <br />the prep phase. <br /> <br /> <br />Cost of Activities <br />Costs will be billed at a flat rate inclusive of time and travel. Any deviation from the proposed <br />activities may affect the billing structure and will be negotiated at the time of modification. <br />Activity Cost <br />1: System Modeling and Initiative Planning Work Session $ 20,000 <br />Total $ 20,000 <br /> <br />**Precise costs for activities will be provided after initiative plan is finalized and <br />funded. The following chart provides cost estimates based on likely activities and <br />timelines. ** <br /> <br />Activity Estimated <br />Duration <br />Monthly <br />Cost <br />Estimated <br />Total Cost <br />2: Preparing for Launch of Initiative – Phase 1 4 <br />Months <br />$ 20,000 $ 80,000 <br />** Total Estimated Costs for Activity 2 $ 80,000 <br /> <br />Contact: Mandy Chapman Semple, mcs@clutchconsultingroup.com, 713-897-1528 <br /> <br /> <br /> <br />Docusign Envelope ID: E54A73BB-E871-8CF1-8127-F377104CD7AF