Orange County NC Website
Inclusions <br />1.Freight <br />2.Engineering <br />3.Project Management for Siemens Scope of work <br />4.System Commissioning and Final Pretest <br />5.Final AHJ Testing and certification <br />6.Fire Alarm Submittal to customer <br />7.Fire Alarm Permit or Electrical Permit or costs associated with this project. <br />8.Professional Engineers stamp which may be required <br />9.Bonding <br />10.Supply or installation of any electrical conduits, cables, wiring or back boxes, and equipment <br />11.As interpreted in the specifications, as shown on drawings, and as defined in this proposal <br />12.Price is based on Auto-CAD electronic drawings for the project being supplied to us by others <br />13.DACT <br />14.One (1) year warranty <br />15.New Fire Alarm Cabling <br />16.Demo of existing Fire Alarm System <br />17.Final wiring terminations to the control panel <br />18.Fire Caulk <br />19.Electronic (PDF) submittals <br />20.Electronic (PDF) O&M manuals <br />21.Pt. Id Programming <br />22.Customer Training - 1 hour <br />23.Overtime 8 hours. <br />24.Rath AOR - Bldg. A only <br />25.Smart Sprinkler Monitoring > dedicated 120v power from breaker. <br />26.Fire Manager > Bldg. X > Cloud Gateway <br />Page 5 of 11 <br />Docusign Envelope ID: 08E91030-922D-4709-869D-15E7C7C2215B