Orange County NC Website
Exclusions <br />1. Offsite system monitoring fees <br />2. Cost associated with multiple trips to the job site due to incompletion by others <br />3. Working in areas containing hazardous materials or confined space <br />4. Cost associated with schedule acceleration or multiple unplanned phases <br />5. Telephone line for DACT and/or IP Network Connection <br />6. Costs associated with bypassing the system during construction <br />7. Building and construction permit fees <br />8. Creating base building auto cad drawings for the project <br />9. Ceiling and/or wall removal, replacement, patching, and painting <br />10. Per project aggregate general liability insurance <br />11. Overtime <br />12. After hours work <br />13. Additional testing due to others <br />14. Dedicated phone lines <br />15. Dedicated IP Network Drop <br />16.Sales tax will not be included on the invoice unless Siemens receives a completed NCDOR E589CI <br />17. Conduit raceway, Electrical boxes and supports <br />18. External NAPCO antenna <br />19. Special insurance <br />20. Remote monitoring related services <br />21. Scaffolding and lifts <br />22. Knox box <br />23. Shunt trip breakers <br />24. Security system interface or door lock release <br />25. Back boxes for devices are not included unless listed in this proposal's provided equipment list <br />26. Fire Watch or other costs associated with temporary measures while the system is down or impaired (one <br />week expected downtime) <br />Page 6 of 11 <br />Docusign Envelope ID: 08E91030-922D-4709-869D-15E7C7C2215B