Browse
Search
2026-171-E-AMS-Siemens Industry- Animal Services Facility and Richard E Whitted Complex building a & B fire alarm replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2026
>
2026-171-E-AMS-Siemens Industry- Animal Services Facility and Richard E Whitted Complex building a & B fire alarm replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2026 1:56:57 PM
Creation date
5/13/2026 1:49:41 PM
Metadata
Fields
Template:
Contract
Date
5/4/2026
Contract Starting Date
5/4/2026
Contract Ending Date
5/5/2026
Contract Document Type
Contract
Amount
$577,879.57
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Work <br />Siemens is pleased to present a one‑for‑one Fire Alarm System field device migration for the OC Animal <br />Services Fire Alarm Migration – Project 44OP. The scope of work includes the replacement of one (1) Fire <br />Alarm Control Panel, two (2) booster panels, one (1) NAPCO cellular communicator, one (1) smart sprinkler <br />panel, one (1) Building X Cloud Gateway, and a non‑voice NAC circuit & remote annunciator. <br />The system design and device quantities are based strictly on the AHJ‑stamped, approved construction <br />drawings and reflect a one‑for‑one replacement of existing fire alarm field devices to include two (2) CO <br />detectors and 1 chime/strobe. <br />Any additions, deletions, or modifications beyond this approved design shall be considered outside the base <br />scope and will be addressed via a change order. <br />Project Duration: May 2026 to September 30, 2026. <br />Any field changes that deviate from the AHJ‑approved drawings as a result of site conditions, owner <br />requests, or regulatory requirements shall constitute a change order to Siemens Industry, Inc. Please refer to <br />the Inclusions, Exclusions, Clarifications, and Bill of Materials included in this proposal for further definition of <br />the project scope. <br />Page 4 of 11 <br />Docusign Envelope ID: 08E91030-922D-4709-869D-15E7C7C2215B
The URL can be used to link to this page
Your browser does not support the video tag.