Browse
Search
2026-161-E-AMS-Simpson Electrical-Emergency Services - Install Additional Generator
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2026
>
2026-161-E-AMS-Simpson Electrical-Emergency Services - Install Additional Generator
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2026 2:00:49 PM
Creation date
5/13/2026 1:41:48 PM
Metadata
Fields
Template:
Contract
Date
4/21/2026
Contract Starting Date
4/21/2026
Contract Ending Date
4/29/2026
Contract Document Type
Contract
Amount
$229,750.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Emergency Services -Generator <br />PDC Project 24030 Administrative Requirements 01 30 00 - 2 <br />4.Identification of problems that impede,or will impede,planned progress. <br />5.Review of submittals schedule and status of submittals. <br />6.Maintenance of progress schedule. <br />7.Corrective measures to regain projected schedules. <br />8.Planned progress during succeeding work period. <br />9.Maintenance of quality and work standards. <br />10.Effect of proposed changes on progress schedule and coordination. <br />11.Other business relating to work. <br />E.Record minutes and distribute copies within two days after meeting to participants,with two copies <br />to Architect,Owner,participants,and those affected by decisions made. <br />3.03 CONSTRUCTION PROGRESS SCHEDULE -SEE SECTION 01 32 16 <br />A.Within 10 days after date of the Agreement,submit preliminary schedule defining planned <br />operations for the first 60 days of work,with a general outline for remainder of work. <br />3.04 SUBMITTALS FOR REVIEW <br />A.When the following are specified in individual sections,submit them for review: <br />1.Product data. <br />2.Shop drawings. <br />3.Samples for selection. <br />4.Samples for verification. <br />B.Submit to Architect for review for the limited purpose of checking for compliance with information <br />given and the design concept expressed in Contract Documents. <br />C.Samples will be reviewed for aesthetic,color,or finish selection. <br />D.After review,provide copies and distribute in accordance with SUBMITTAL PROCEDURES article <br />below and for record documents purposes described in Section 01 78 00 -Closeout Submittals. <br />3.05 SUBMITTALS FOR INFORMATION <br />A.When the following are specified in individual sections,submit them for information: <br />1.Design data. <br />2.Certificates. <br />3.Test reports. <br />4.Inspection reports. <br />5.Manufacturer's instructions. <br />6.Manufacturer's field reports. <br />7.Other types indicated. <br />B.Submit for Architect's knowledge as contract administrator or for Owner. <br />3.06 SUBMITTALS FOR PROJECT CLOSEOUT <br />A.Submit Correction Punch List for Substantial Completion. <br />B.Submit Final Correction Punch List for Substantial Completion. <br />C.When the following are specified in individual sections,submit them at project closeout in <br />compliance with requirements of Section 01 78 00 -Closeout Submittals: <br />1.Project record documents. <br />2.Operation and maintenance data. <br />3.Warranties. <br />4.Bonds. <br />5.Other types as indicated. <br />D.Submit for Owner's benefit during and after project completion. <br />Docusign Envelope ID: DEDB83DA-7916-8AE5-81B0-AA1EA4D56AE9
The URL can be used to link to this page
Your browser does not support the video tag.