Browse
Search
2026-161-E-AMS-Simpson Electrical-Emergency Services - Install Additional Generator
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2026
>
2026-161-E-AMS-Simpson Electrical-Emergency Services - Install Additional Generator
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2026 2:00:49 PM
Creation date
5/13/2026 1:41:48 PM
Metadata
Fields
Template:
Contract
Date
4/21/2026
Contract Starting Date
4/21/2026
Contract Ending Date
4/29/2026
Contract Document Type
Contract
Amount
$229,750.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Emergency Services -Generator <br />PDC Project 24030 Administrative Requirements 01 30 00 - 1 <br />SECTION 01 30 00 <br />ADMINISTRATIVE REQUIREMENTS <br />PART 1 GENERAL <br />1.01 SECTION INCLUDES <br />A.Preconstruction meeting. <br />B.Progress meetings. <br />C.Construction progress schedule. <br />D.Submittals for review,information,and project closeout. <br />E.Number of copies of submittals. <br />F.Requests for Interpretation (RFI)procedures. <br />G.Submittal procedures. <br />PART 2 PRODUCTS -NOT USED <br />PART 3 EXECUTION <br />3.01 PRECONSTRUCTION MEETING <br />A.Architect will schedule a meeting after Construction Contracts are finalized. <br />B.Attendance Required: <br />1.Owner. <br />2.Architect. <br />3.Contractor. <br />C.Agenda: <br />1.Execution of Owner-Contractor Agreement. <br />2.Submission of executed bonds and insurance certificates. <br />3.Distribution of Contract Documents. <br />4.Submission of list of subcontractors,list of products,schedule of values,and progress <br />schedule. <br />5.Designation of personnel representing the parties to Contract and Engineer. <br />6.Procedures and processing of field decisions,submittals,substitutions,applications for <br />payments,proposal request,Change Orders,and Contract closeout procedures. <br />7.Scheduling. <br />D.Record minutes and distribute copies within two days after meeting to participants,with two copies <br />to Architect,Owner,participants,and those affected by decisions made. <br />3.02 PROGRESS MEETINGS <br />A.Schedule and administer meetings throughout progress of the work at maximum bi-monthly <br />intervals. <br />B.Make arrangements for meetings,prepare agenda with copies for participants,preside at <br />meetings. <br />C.Attendance Required: <br />1.Contractor. <br />2.Owner. <br />3.Architect. <br />4.Contractor's superintendent. <br />5.Major subcontractors. <br />D.Agenda: <br />1.Review minutes of previous meetings. <br />2.Review of work progress. <br />3.Field observations,problems,and decisions. <br />Docusign Envelope ID: DEDB83DA-7916-8AE5-81B0-AA1EA4D56AE9
The URL can be used to link to this page
Your browser does not support the video tag.