Browse
Search
2026-161-E-AMS-Simpson Electrical-Emergency Services - Install Additional Generator
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2026
>
2026-161-E-AMS-Simpson Electrical-Emergency Services - Install Additional Generator
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2026 2:00:49 PM
Creation date
5/13/2026 1:41:48 PM
Metadata
Fields
Template:
Contract
Date
4/21/2026
Contract Starting Date
4/21/2026
Contract Ending Date
4/29/2026
Contract Document Type
Contract
Amount
$229,750.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Emergency Services -Generator <br />PDC Project 24030 Transfer Switches 26 36 00 - 1 <br />SECTION 26 36 00 <br />TRANSFER SWITCHES <br />PART 1 GENERAL <br />1.01 SECTION INCLUDES <br />A.Transfer switches for low-voltage (600 V and less)applications and associated accessories: <br />1.Automatic transfer switches. <br />2.Includes service entrance rated transfer switches. <br />3.Includes bypass/isolation transfer switches. <br />1.02 REFERENCE STANDARDS <br />A.NFPA 110 -Standard for Emergency and Standby Power Systems;2025. <br />B.UL 1008 -Transfer Switch Equipment;Current Edition,Including All Revisions. <br />C.NFPA 70 -National Electrical Code;National Fire Protection Association,Including All Applicable <br />Amendments and Supplements;2023. <br />1.03 ADMINISTRATIVE REQUIREMENTS <br />A.Coordination: <br />1.Coordinate compatibility of transfer switches to be installed with work provided under other <br />sections or by others. <br />a.Engine Generators: See Section 26 32 13. <br />2.Coordinate the work with other trades to avoid placement of ductwork,piping,equipment,or <br />other potential obstructions within the dedicated equipment spaces and working clearances <br />required by NFPA 70. <br />3.Coordinate arrangement of equipment with the dimensions and clearance requirements of the <br />actual equipment to be installed. <br />4.Coordinate the work with placement of supports,anchors,etc.required for mounting. <br />5.Notify Architect of any conflicts with or deviations from Contract Documents.Obtain direction <br />before proceeding with work. <br />B.Where work of this section involves interruption of existing electrical service,arrange service <br />interruption with Owner. <br />1.04 SUBMITTALS <br />A.Product Data: Provide manufacturer's standard catalog pages and data sheets for each product, <br />including ratings,configurations,dimensions,finishes,weights,service condition requirements, <br />and installed features. <br />B.Shop Drawings: Include dimensioned plan views and sections indicating locations of system <br />components,required clearances,and field connection locations.Include system interconnection <br />schematic diagrams showing all factory and field connections. <br />1.It is the contractor's responsibility to ensure that the equipment submitted to comply with the <br />requirements of this section are in compliance with the requirements and recommendations <br />of the power system studies.Any changes recommended by the power system study shall be <br />incorporated at no expense to the project. <br />C.Specimen Warranty: Submit sample of manufacturer's warranty. <br />D.Evidence of qualifications for installer. <br />E.Evidence of qualifications for maintenance contractor (if different entity from installer). <br />F.Manufacturer's Installation Instructions: Indicate application conditions and limitations of use <br />stipulated by product testing agency. Include instructions for storage,handling,protection, <br />examination,preparation,installation,and operation of product. <br />G.Manufacturer's certification that products meet or exceed specified requirements. <br />H.Source quality control test reports. <br />Docusign Envelope ID: DEDB83DA-7916-8AE5-81B0-AA1EA4D56AE9
The URL can be used to link to this page
Your browser does not support the video tag.